[1] |
陈建东,王晶. 国外海上风电的发展现状、趋势与展望[J]. 世界科技研究与发展,2014,36(4):458-464.
CHEN J D,WANG J. The development,trend and prospect of offshore wind power abroad[J]. World Sci-Tech R & D,2014,36(4):458-464. |
[2] |
毕明君. 海上风机单桩基础选型设计方法[J]. 南方能源建设,2017,4(增刊1):56-61.
BI M J. Selection and design method of single pile foundation for offshore fan[J]. Southern Energy Construction,2017,4(Supp.1):56-61. |
[3] |
中华人民共和国交通运输部. JTS 167-4—2012,港口工程桩基规范 [S]. 北京:人民交通出版社,2012. |
[4] |
NAKAYAMA J, FUJISEKI Y. A pile load testing method: 1973-27007 [P]. 1973. |
[5] |
OSTERBERG J. New device for load testing driven piles drilled shaft separates friction and end bearing[J]. Pilingand Deep Foundations, 1989, 3: 421-427. |
[6] |
OSTERBERG J. The osterberg load test method for drilled shaft and driven piles [C]//7th International Conference Exhibit on Piling and Deep Foundations, Vienna, Austria, April 3-7, 1998:201-207. |
[7] |
NISHIMURA S. Pile capacity management by the application of Statnamic test loading text [C]//7th International Conference and Exhibition on Piling and Deep foundations, Vienna, Austria, April 3-7, 1998.[S.l.:s.n.],1998:15-18. |
[8] |
徐彬,易神州,张昆,等. 基于API规范的海上大直径钢管桩静压载试验分析[J]. 中国海洋大学学报,2017,47(10):134-140.
XU B,YI S Z,ZHANG K,et al. Static load test and analysis of offshore large-diameter steel pipe pile based on API code[J]. Journal of Ocean University of China,2017,47(10):134-140. |
[9] |
董淑海,陈锦剑,王建华. 大直径水下钢管桩竖向承载力的现场试验分析[J]. 土木工程学报,2007,40:228-232.
DONG S H,CHEN J J,WANG J H. Field test and analysis of vertical bearing capacity of large diameter underwater steel pipe pile[J]. China Civil Engineering Journal,2007,40:228-232. |
[10] |
朱照清,龚维明,戴国亮. 大直径钢管桩水平承载力现场试验研究[J]. 建筑科学,2010,26(9):36-39.
ZHU Z Q,GONG W M,DAI G L. Field test research on horizontal bearing capacity of large diameter steel pipe pile[J]. Architecture Science,2010,26(9):36-39. |
[11] |
石振明,宋晶. 光纤检测技术在海上钢管桩试桩中的应用[J]. 工程地质学报,2016,24(2):315-323. |
[12] |
梁迎宾. 某海上风电试桩工程施工管理浅析[J]. 中国水运,2015,15(6):138-139.
LIANG Y B. Analysis on construction management of a sea wind power test pile project[J]. China Water Transport,2015,15(6):138-139. |
[13] |
肖金品,彭文滔,胡春林,等. 基于桩身位移测量的自平衡试桩极限承载力确定方法[J]. 武汉理工大学学报,2013,35(8):103-107.
XIAO J P,PENG W T,HU C L,et al. Determination method of ultimate bearing capacity of self-balanced test pile based on pile displacement measurement[J]. Journal of Wuhan University of Technology,2013,35(8):103-107. |
[14] |
周明星,王鹏,程宝辉. 自平衡试桩法关键问题探讨[J]. 桥梁建设,2008(6):68-72. |
[15] |
聂如松,冷伍明,魏巍. 自平衡试桩法一种等效转换方法[J]. 岩土工程学报,2011,33(2):188-191. |
[16] |
朱向荣,汪胜忠,叶俊能,等. 自平衡试桩荷载传递模型及荷载-沉降曲线转换方法改进研究[J]. 岩土工程学报,2011,32(11):1717-1721. |
[17] |
柯洪,赵春宏,朱宾勤,等. 后压浆大直径超长钻孔灌注桩试桩工艺[J]. 施工技术,2015,44(7):90-98. |
[18] |
姚杰. 超长钻孔灌注桩试桩的监理监控重点[J]. 建设管理,2011(5):53-56. |
[19] |
邱世忠,王恕根. 75米超长钢管桩试桩实践[J]. 建筑施工,1985(1):18-23. |
[20] |
周龙. 砂土中海上风电超大直径钢管桩桩土相互作用研究 [D]. 天津:天津大学,2014. |
[21] |
江波,肖晶晶,严俊明. 我国海上风电施工能力分析[J]. 可再生能源,2007, 25(4):104-106. |
[22] |
张海亚,郑晨. 海上风电安装船的发展趋势研究[J]. 船舶工程,2016, 38(1):1-7. |