[1] 国家核安全局. HAF JXXXX核动力厂厂址应急条件评价(报批稿) [Z]. 2012.
[2] THOMAS Urbanik. Evacuation Time Estimates for Nuclear Power Plants [J]. Journal of Hazardous Materials. 2000(75):165-180.
[3] Nuclear Regulatory Commission (NRC). Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants [R]. NUREG-0654/FEMA-REP-1, Rev. 1, 1980.
[4] 赵善桂,张琳,陈晓秋,等. 核电厂应急撤离的有关问题 [J]. 核安全,2008(4):52-56, 59.
[5] 王海峰,上官志洪,赵锋,等. 核电厂核事故应急疏散研究 [J]. 中国安全科学学报,2010,20(7):26-31.
[6] 胡啸宇,曹建主,曲静原. 基于OREMS的核电厂址撤离时间估计 [J]. 辐射防护通讯,2011,31(2):14-20.
[7] Nuclear Regulatory Commission (NRC). Criteria for Development of Evacuation Time Estimate Studies [R]. NUREG/CR-7002,SAND2010-0016P,2011.
[8] Nuclear Regulatory Commission (NRC). Identification and Analysis of Factors Affecting Emergency Evacuations [R]. NUREG/CR-6864 SAND2004-5901,Vol. 1,2005.