[1] GB 50660—2011,大中型火力发电厂设计规范 [S].
[2] GB/T 754—2007,发电用汽轮机参数系列 [S].
[3] 周菁,段学友. 汽轮机组启动方式特点研究与探讨 [J]. 电站系统工程,2008, 25(6): 34-36.

ZHOU Jing, DUAN Xueyou. Research and Discussion on Turbine unit Start-up mode and Characteristics [J]. Power System Engineering, 2008, 25(6): 34-36.
[4] 李跃奇,杨剑永. 国产亚临界350 MW汽轮机经济性分析 [J]. 东北电力技术,2008(6): 20-22.

LI Yueqi, YANG Jianyong. Economic Analysis on Home-made Subcritical 350 MW Steam Turbine [J]. Northeast Electric Power Technology, 2008(6): 20-22.
[5] 陈显辉,李曦滨,吴其林,等. 东方第八代300 MW汽轮机通流改造及性能评价[J]. 东方汽轮机,2010(3): 11-14.

CHEN Xianhui, LI Xibin, Wu Qilin, et al. The Reform of Steam Path and Rating of Merit for Dongfang Ⅷ 300 MW Steam Turbine [J]. Dong Fang Turbine, 2010(3): 11-14.
[6] 胡光明,徐仿优,刘光耀,等. 沙角A电厂300 MW机组节能诊断分析 [J]. 热力发电,2010, 39(6): 5-10.

HU Guangming, XU Fangyou, LIU Guangyao, et al. Diagnosis and Analysis of Energy Saving for 300 MW unit in Shao Jiao A Power Plantiao A Power Plant [J]. Thermal Power Generation, 2010, 39(6): 5-10.
[7] 邵峰,周胜男. 典型热力系统节能诊断分析 [J]. 热力发电,2011, 40(7): 59-61.

SHAO Feng, ZHOU Shengnan. Diagnosis and Analysis of Energy Saving in Typical Thermodynamic System [J]. Thermal Power Generation, 2010, 40(7): 59-61.
[8] 缪国钧,葛晓霞. 典汽轮机轴封系统漏汽对机组经济性的影响 [J]. 汽轮机技术,2007, 49(4): 305-307.

MIAO Guojun, GE Xiaoxia. Steam Turbine Shaft Gland System Leakage Steam Effect on unit Economic [J]. Turbine Technology, 2007, 49(4): 305-307.
[9] 查冰峰. 200 MW汽轮机通流部分改造及效果分析 [J]. 华中电力,2008, 21(5): 40-43.

ZHA Bingfeng. The Reconstruction of the 200 MW Turbine flow Section and its Effect [J]. Central China Electric Power, 2008, 21 (5): 40-43.