[1] 黄政宇. “华龙一号”核电工程混凝土管理模式研究 [J]. 南方能源建设,2016, 3(3): 116-121.

HUANG Z Y. Research on concrete management patterns of HPR 1 000 NPP [J]. Southern Energy Construction, 2016, 3(3): 116-121.
[2] 孙汉虹,程平东. 核电工程项目管理[M]. 北京:中国电力出版社,2006,11(1): 4-11.

SUN H H. CHENG P D. Nuclear Project Management [M]. Beijing: China Electric Power Press,2006,11(1):4-11.
[3] 何润财,涂国富. EPC工程总承包项目中采购成本控制 [J]. 南方能源建设,2016, 3(增刊1): 173-176.

HE R C, TU G F. Procurement cost control in EPC general contract project [J]. Southern Energy Construction, 2016, 3(Supp.1): 173-176.
[4] 汪映荣,中电投核电有限公司.核电前期工作指南 [M]. 北京:中国电力出版社,2012: 10-98.

WANG Y R, CPI Nuclear Power Co., Ltd. Nuclear Power Preliminary Work Guidance [M]. Beijing: China Electric Power Press, 2012: 10-98.
[5] 刘小坚. 核电前期项目公众沟通问题研究 [J]. 南方能源建设,2017, 4(4): 8-14.

LIU X J. Research on public communication of nuclear preliminary project in China [J]. Southern Energy Construction, 2017, 4(4): 8-14.
[6] 李永华,白晋华. 结合福岛核事故探讨IAEA核电厂设计安全要求 [J]. 南方能源建设,2015, 2(4): 155-158.

LI Y H, BAI J H. Study on the safety requirements of nuclear power plants design based on Fukushima nuclear accident feedback [J]. Southern Energy Construction, 2015, 2(4): 155-158.
[7] 秦晋. 海外总承包项目前期税务筹划分析 [J]. 南方能源建设,2017, 4(增刊1): 179-184.

QIN J. Analysis of advance tax planning for overseas EPC project [J]. Southern Energy Construction, 2017, 4(Supp.1): 179-184.
[8] 张羽,胡亮. 关于总承包业务设计优化、采购成本控制的思考 [J]. 南方能源建设,2016, 3(增刊1): 165-167+185.

ZHANG Y, HU L. Design optimization and procurement cost control of EPC project [J]. Southern Energy Construction, 2016, 3(Supp.1): 165-167+185.
[9] 张菊梅,苏非,吴强,等. 浅析“十一五”及“十二五”期间抽水蓄能电站造价水平 [J]. 南方能源建设,2017,4(增刊1): 150-153.

ZHANG J M, SU F, WU Q, et al. Analysis of the cost level of pumped storage power station during the 11th five year plan and the 12th five year plan period [J]. Southern Energy Construction, 2017, 4(Supp.1): 150-153.
[10] 罗莎莎,韩冰,刘云,等. 广东抽水蓄能电站功能发挥情况研究 [J]. 南方能源建设,2017, 4(3): 69-74.

LUO S S, HAN B, LIU Y, et al. Research on the main functions of pumped-storage plants in Guangdong [J]. Southern Energy Construction, 2017, 4(3): 69-74.