[1] |
谢坚勇. 回转式空气预热器堵灰原因分析及其预防措施 [J]. 热力发电,2007,36(6): 55-57.
XIE J Y. Cause analysis of ash clogging in regenerative air heater and preventive measures thereof [J]. Thermal Power Generation,2007,36(6): 55-57. |
[2] |
王春昌. 电站现役锅炉取消暖风器或热风循环装置的可行性分析 [J]. 热力发电,2009,38(2): 51-53.
WANG C C. Feasibility analysis of abolishing the steam air-heater or hot air circulating facitity for oal-fired boilers in power plants [J]. Thermal Power Generation,2009,38(2): 51-53. |
[3] |
王钟. 锅炉暖风器的选择和冷风温度控制 [J]. 东北电力技术,2002,23(6): 1-4.
WANG Z. Selection of boiler air heater and its air cooler thermal control [J]. Northeast Electric Power Technology, 2002, 23(6): 1-4. |
[4] |
吴元新. 暖风器的功能、结构型式和设计原理 [J]. 余热锅炉,2003(1): 10-11.
WU Y X. The function, structural style and design philosophy of steam air heater [J]. Waste Heat Boiler, 2003(1): 10-11. |
[5] |
赵之军. 锅炉暖风器系统存在的问题及解决措施 [J]. 发电设备,2005,19(2): 94-96.
ZHAO Z J. Problems existing with air preheating systems of boilers and ways of solution [J]. Power Equipment,2005,19(2): 94-96. |
[6] |
陈卓卫,孙超凡,洪喜彬,等. 300 MW循环流化床锅炉改烧低灰分褐煤试验研究 [J]. 广东电力,2016,29(1): 17-21.
CHEN Z W, SUN C F, HONG X B, et al. Experimental research on 300 MW circulating fluidized bed boiler changing to burn low ash content lignite [J]. Guangdong Electric Power,2016,29(1): 17-21. |
[7] |
殷术贵,吴智恒,张华伟,等. 循环流化床锅炉燃烧过程仿真研究 [J]. 广东电力,2016,29(1): 8-10.
YIN S G, WU Z H, ZHANG H W, et al. Simulation research on combustion process of circulating fluidized bed boiler [J]. Guangdong Electric Power,2016,29(1): 8-10. |
[8] |
唐兆芳,刘俊忠,李新明,等. 锅炉暖风器系统与热风再循环系统对比分析 [J]. 发电设备,2004,18(3): 130-133.
TANG Z F, LIU J Z, LI Z M,et al. Comparison of air heater systems of boilers with hot air recirculating systems [J]. Power Equipment,2004,18(3): 130-133. |
[9] |
李德波,沈跃良,余岳溪,等. 旋流燃烧煤粉锅炉主要烟气组分及分布规律试验 [J]. 广东电力,2016,29(3): 1-7.
LI D B, SHEN Y L, YU Y X, et al. Experiments on main flue gas components and distribution regularities for pul-verized coal-fired boiler with swirling combustion [J]. Guangdong Electric Power,2016,29(3): 1-7. |
[10] |
李德波,曾庭华,廖永进,等. 600 MW电站锅炉SCR脱硝系统全负荷投运改造方案研究与工程实践[J]. 广东电力,2016,29(6): 12-17.
LI D B, ZENG T H, LIAO Y J, et al. Research on transformation scheme for full-load operation of SCR denitration system of 600 MW substation boiler and engineering practice [J]. Guangdong Electric Power,2016,29(6): 12-17. |