[1] 彭献永,唐兆芳,葛斌. 凝汽式汽轮机供热改造中汽缸开孔处应力的研究和分析 [J]. 汽轮机技术,2006, 48(5): 339-342.

PENG Xianyong, TANG Zhaofang, GE Bin. Study and Analysis on Stress of the Casing in Retrofitting Condensing Turbine to Extraction Turbine for Supplying Heat [J]. Turbine Technology, 2006, 48(5): 339-342.
[2] 朱雁军. N110-90/535型汽轮机供热改造及经济性测算 [J]. 河北电力技术,2007, 26(4): 33-34.

ZHU Yanjun. Heat Supply Reformation and Economy Calculation for N110-90/535 Steam Turbine [J]. Hebei Electric Power, 2007, 26(4): 33-34.
[3] 许琦,马骏驰,王小伟. 国产300 MW机组高再抽汽供热改造 [J]. 华东电力,2008, 36(6): 101-103.

XU Qi, MA Junchi, WANG Xiaowei. Steam Extraction Cogeneration Retrofits for High Temperature Reheaters of Domestically-made 300 MW Units [J]. East China Electric Power, 2008, 36(6): 101-103.
[4] 孔令先,李继伟,李宏伟. 220 MW汽轮机供热改造研究与应用 [J]. 节能技术,2010, 28(162): 319-328.

KONG Lingxian, LI Jiwei, LI Hongwei. Research and Application of 220 MW Steam Turbine Heat Transformation [J]. Energy Conservation Technology, 2010, 28(162): 319-328.
[5] 李志才,赵巨国,黄国军. 330 MW汽轮机打孔抽汽供热改造 [J]. 吉林电力,2010, 38(3): 44-45.

LI Zhicai, Zhao Juguo, HUANG Guojun. Heat-Supplying Retrofitting with Steam Extracted from Inter-connecting Pipe of 330 MW Turbine [J]. Jilin Electric Power, 2010, 38(3): 44-45.
[6] 王聚中,张维明,李国政. 200 MW供热机组工业抽汽改造方案的研究分析 [J]. 河南电力,2011, 32(2): 49-52.

WANG Juzhong, ZHANG Weiming, LI Guozheng. The Heating Steam Turbine of 200 MW Industrial Transformation Feasibility Study Analysis [J]. Henan Electric Power, 2011, 32(2): 49-52.
[7] 杨圣春. 凝汽发电机组的供热改造方法研究 [J]. 电力学报,2011, 26(4): 357-360.

YANG Shengchun. Study on Heat Supply Reform Methods of Condensing Steam Turbines [J]. Journal of Electric Power, 2011, 26(4): 357-360.
[8] 柴国旭,郑莆燕,张跃进. 凝汽式机组工业供热改造方案分析与比较 [J]. 浙江电力,2012, 40(1): 32-34.

CHAI Guoxu, ZHENG Puyan, ZHANG Yuejing. Analysis and Comparison of Industrial Heat Supply Retrofit Schemes for Condensing Unit [J]. Zhejiang Electric Power, 2012, 40(1): 32-34.
[9] 戈志华,杨佳霖,何坚忍. 大型纯凝汽轮机供热改造节能研究 [J]. 中国电机工程学报,2012, 32(17): 25-30.

GE Zhihua, YANG Jialin, HE Jianren. Energy Saving Research of Heating Retrofitting for Large Scale Condensing Turbine [J]. Proceeding of the CSEE, 2012, 32(17): 25-30.
[10] 周琳,谭锐,卫栋梁. 东汽纯凝600 MW级火电机组供热改造探讨 [J]. 东方电气评论,2012, 26(102): 8-13.

ZHOU Lin, TAN Rui, WEI Dongliang. Discussion on the Heat Supply Reform of 600 MW Condensing Thermal Power Unit [J]. Dongfang Electric Review, 2012, 26(102): 8-13.
[11] 郑莆燕,柴国旭,任建兴. 供热改造机组运行性能研究 [J]. 华东电力,2013, 41(6): 1393-1395.

ZHENG Puyan, CHAI Guoxu, REN Jianxing. Operating Performance of Cogeneration Retrofits Unit [J]. East China Electric Power, 2013, 41(6): 1393-1395.
[12] 谭天荣. 粤泷电厂纯凝式机组供热改造 [J]. 吉林电力,2014, 42(4): 40-42.

TAN Tianrong. Heat Supplying Retrofit for Condensing Unit in Yuelong Power Station [J]. Jilin Electric Power, 2014, 42(4): 40-42.
[13] 王明军. 利用汽轮机进行供热的方法探究 [J]. 热力透平,2014, 43(2): 124-126.

WANG Mingjun. Investigation of Heating Supply by Using Steam Turbine [J]. Thermal Turbine, 2014, 43(2): 124-126.