[1] |
陈晨, 丁宏成, 石勇. 海上风电场升压站的电气设计 [J]. 吉林电力, 2018, 46(6): 24-27. DOI: 10.16109/j.cnki.jldl.2018.06.011.
CHEN C, DING H C, SHI Y. Electrical design of step-up station in offshore substation [J]. Jilin electric power, 2018, 46(6): 24-27. DOI: 10.16109/j.cnki.jldl.2018.06.011. |
[2] |
黄玲玲, 汤华, 曹家麟, 等. 交流海上变电站设计相关研究综述 [J]. 中国电机工程学报, 2017, 37(5): 1351-1359. DOI: 10.13334/j.0258-8013.pcsee.162154.
HUANG L L, TANG H, CAO J L, et al. Analysis and prospects of offshore AC substation design technology [J]. Proceedings of the CSEE, 2017, 37(5): 1351-1359. DOI: 10.13334/j.0258-8013.pcsee.162154. |
[3] |
李润源. 400 MW海上风电场海上升压站的电气设计研究 [D]. 上海: 上海交通大学, 2019. DOI: 10.27307/d.cnki.gsjtu.2019.001668.
LI R Y. The research on electrical design of offshore substations for 400 MW offshore wind farm [D]. Shanghai: Shanghai Jiao Tong University, 2019. DOI: 10.27307/d.cnki.gsjtu.2019.001668. |
[4] |
王建楹, 郝登运, 武雪林, 等. 300 MW/220 kV海上升压站电气一次设计研究 [J]. 舰船科学技术, 2021, 43(17): 133-136. DOI: 10.3404/j.issn.1672-7649.2021.09.026.
WANG J Y, HAO D Y, WU X L, et al. Research on primary electrical design of 300 MW/220 kV offshore booster station [J]. Ship science and technology, 2021, 43(17): 133-136. DOI: 10.3404/j.issn.1672-7649.2021.09.026. |
[5] |
郭忠敏, 韩兴国. 高压设备(电缆、GIS)特殊试验技术 [J]. 四川水力发电, 2016, 35(2): 1-25. DOI: 10.3969/j.issn.1001-2184.2016.02.002.
GUO Z M, HAN X G. Special testing techniques for high-voltage equipment (cables, GIS) [J]. Sichuan water power, 2016, 35(2): 1-25. DOI: 10.3969/j.issn.1001-2184.2016.02.002. |
[6] |
何善庆. 大朝山500 kV GIS、GIB及电缆的现场试验 [J]. 高电压技术, 2003, 29(6): 49-51. DOI: 10.3969/j.issn.1003-6520.2003.06.020.
HE S Q. Site test of the 500 kV GIS & GIB and cable for Dachaoshan hydro power station [J]. High voltage engineering, 2003, 29(6): 49-51. DOI: 10.3969/j.issn.1003-6520.2003.06.020. |
[7] |
杨建军, 俞华锋, 赵生校, 等. 海上风电场升压变电站设计基本要求的研究 [J]. 中国电机工程学报, 2016, 36(14): 3781-3788. DOI: 10.13334/j.0258-8013.pcsee.152761.
YANG J J, YU H F, ZHAO S X, et al. Research on basic requirements of offshore substation design [J]. Proceedings of the CSEE, 2016, 36(14): 3781-3788. DOI: 10.13334/j.0258-8013.pcsee.152761. |
[8] |
张宾瑞, 王小刚, 苏磊. 海上升压站设计优化研究 [J]. 南方能源建设, 2023, 10(1): 105-111. DOI: 10.16516/j.gedi.issn20 95-8676.2023.01.013.
ZHANG B R, WANG X G, SU L. Research on design optimization of offshore booster stations [J]. Southern energy construction, 2023, 10(1): 105-111. DOI: 10.16516/j.gedi.issn20 95-8676.2023.01.013. |
[9] |
和庆冬, 朱瑞军, 梅春. 400 MW海上升压站电气主接线方案探讨 [J]. 南方能源建设, 2019, 6(4): 80-85. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.013.
HE Q D, ZHU R J, MEI C. Discussions on the main electrical wiring scheme for a 400 MW offshore substation station [J]. Southern energy construction, 2019, 6(4): 80-85. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.013. |
[10] |
常凌凌. 海上升压站GIS安装优化改进技术研究 [J]. 工程建设与设计, 2021(15): 44-46, 63. DOI: 10.13616/j.cnki.gcjsysj.2021.08.013.
CHANG L L. Research on the optimization and improvement technology of GIS installation of offshore booster station [J]. Construction & design for project, 2021(15): 44-46, 63. DOI: 10.13616/j.cnki.gcjsysj.2021.08.013. |
[11] |
李中祥, 周腊吾, 张春红. 深远海海上升压站500 kV变压器设计与抗短路分析 [J]. 变压器, 2022, 59(12): 1-5. DOI: 10.19487/j.cnki.1001-8425.2022.12.004.
LI Z X, ZHOU L W, ZHANG C H. Design and analysis of short circuit resistance of 500 kV transformer in far-reaching offshore booster station [J]. Transformer, 2022, 59(12): 1-5. DOI: 10.19487/j.cnki.1001-8425.2022.12.004. |
[12] |
中华人民共和国国家发展和改革委员会. 气体绝缘金属封闭开关设备现场耐压及绝缘试验导则: DL/T 555—2004 [S]. 北京: 中国电力出版社, 2004.
National Development and Reform Commission. Guide for withstand voltage and insulated test of gas-insulated metal-enclosure switchgear on site: DL/T 555—2004 [S]. Beijing: China Electric Power Press, 2004. |
[13] |
何仲, 陆歆, 张承信, 等. 高压电缆终端与GIS设备安装配合研究 [J]. 华东电力, 2012, 40(5): 864-869.
HE Z, LU X, ZHANG C X, et al. Insatllation coordination between high voltage cable terminal and GIS [J]. East China electric power, 2012, 40(5): 864-869. |
[14] |
刘金全, 吴永祥, 李红有, 等. 海上升压站总体布置方案及设计原则 [J]. 船舶工程, 2019, 41(增刊1): 406-410. DOI: 10.13788/j.cnki.cbgc.2019.S1.101.
LIU J Q, WU Y X, LI H Y, et al. General layout and design principle of offshore substation [J]. Ship engineering, 2019, 41(Suppl.1): 406-410. DOI: 10.13788/j.cnki.cbgc.2019.S1.101. |
[15] |
许海波, 沙欣宇, 张震宇, 等. 海底电缆铺设过程中受力特性数值模拟研究 [J]. 南方能源建设, 2023, 10(1): 118-123. DOI: 10.16516/j.gedi.issn2095-8676.2023.01.015.
XU H B, SHA X Y, ZHANG Z Y, et al. Numerical simulation study on mechanical characteristics of submarine cable during laying process [J]. Southern energy construction, 2023, 10(1): 118-123. DOI: 10.16516/j.gedi.issn2095-8676.2023.01.015. |
[16] |
IEC. Power cables with extruded insulation and their accessories for rated voltages above 150 kV (Um=170 kV) up to 500 kV (Um=550 kV)-test methods and requirements: IEC 62067—2011 [S]. Geneva: IEC, 2011. |
[17] |
中华人民共和国国家质量监督检验检疫总局, 中国国家标准化管理委员会. 额定电压72.5 kV及以上气体绝缘金属封闭开关设备与充流体及挤包绝缘电力电缆的连接 充流体及干式电缆终端: GB/T 22381—2008 [S]. 北京: 中国标准出版社, 2009.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Cable connections for gas-insulated metal-enclosed switchgear for rated voltages of 72.5 kV and above - fluid-filled and extruded insulation power cables - fluid-filled and dry type cable-terminations: GB/T 22381—2008 [S]. Beijing: Standards Press of China, 2009. |
[18] |
张五杰, 张书琴, 张克选, 等. GIS现场直连方式的相关问题及其解决措施 [J]. 高压电器, 2013, 49(5): 114-119. DOI: 10.13296/j.1001-1609.hva.2013.05.021.
ZHANG W J, ZHANG S Q, ZHANG K X, et al. Problems and solutions related to GIS site direct connection [J]. High voltage apparatus, 2013, 49(5): 114-119. DOI: 10.13296/j.1001-1609.hva.2013.05.021. |
[19] |
李德军, 周剑, 钟孝泰, 等. 海上风电场升压站变压器和GIS的设计、应用和展望 [J]. 高压电器, 2021, 57(1): 1-11. DOI: 10.13296/j.1001-1609.hva.2021.01.001.
LI D J, ZHOU J, ZHONG X T, et al. Design, application and prospect of transformer and GIS in booster substation for offshore wind farm [J]. High voltage apparatus, 2021, 57(1): 1-11. DOI: 10.13296/j.1001-1609.hva.2021.01.001. |
[20] |
中华人民共和国住房和城乡建设部. 电气装置安装工程 电气设备交接试验标准: GB 50150—2016 [S]. 北京: 中国计划出版社, 2016.
Ministry of Housing and Urban-Rural Development of the People's Republic of China. Electric equipment installation engineering-standard for hand-over test of electric equipment: GB 50150—2016 [S]. Beijing: China Planning Press, 2016. |