[1] ZHI H. Risk Management for Overseas Construction Projects [J]. International Journal of Project Management,1995, 13(4): 231-237.
[2] HASTAK M, SHAKED A. ICRAM-1: Model for International Construction Risk Assessment [J]. Journal of Management in Engineering,2000, 16(1): 59-69.
[3] STEFFEY R W, ANANTATMULA V S. International Projects Proposal Analysis: Risk Assessment Using Radial Maps [J]. Project Management Journal,2011, 42(3): 62-74.
[4] HASSANEIN A A G, AFIFY H M F. A Risk Identification Procedure for Construction Contracts - A Case Study of Power Station Projects in Egypt [J]. Civil Engineering and Environmental Systems,2007, 24(1): 3-14.
[5] BALOI D, PRICE A D F. Modelling Global Risk Factors Affecting Construction Cost Performance [J]. International Journal of Project Management,2003, 21(4): 261-269.
[6] WANG S Q, DULAIMI M F, AGURIA M Y. Risk Management Framework for Construction Projects in Developing Countries [J]. Construction Management and Economics,2004, 22(3): 237-252.
[7] HAN S H, DIEKMANN J E. Making a Risk-based Bid Decision for Overseas Construction Projects [J]. Construction Management and Economics,2001, 19(8): 765-776.
[8] LARYEA S, HUGHES W. How Contractors Price Risk in Bids: Theory and Practice [J]. Construction Management and Economics,2008, 26(9): 911-924.
[9] SONMEZ R, ERGIN A, BIRGONUL M T. Quantiative Methodology for Determination of Cost Contingency in International Projects [J]. Journal of Management in Engineering,2007, 23(1): 35-39.
[10] ALESHIN A. Risk Management of International Projects in Russia [J]. International Journal of Project Management,2001, 19(4): 207-222.
[11] TAH J, CARR V. Knowledge-based Approach to Construction Project Risk Management [J]. Journal of Computing in Civil Engineering,2001, 15(3): 170-177.
[12] IDRUS A, FADHIL N M, ROHMAN M A. Development of Project Cost Contingency Estimation Model Using Risk Analysis and Fuzzy Expert System [J]. Expert Systems with Applications,2011, 38(3): 1501-1508.
[13] DIKMEN I, BIRGONUL M T, TAH J H M, et al. Web-based Risk Assessment Tool Using Integrated Duration-cost Influence Network Model [J]. Journal of Construction Engineering and Management,2012, 138(9): 1023-1034.
[14] 全吉,黄剑眉,张水波,等. 基于风险链和风险地图的风险识别和分析方法 [J]. 南方能源建设,2014, 1(1): 92-96.

QUAN Ji, HUANG Jianmei, ZHANG Shuibo, et al. Method of Risk Identification and Analysis Based on Risk Chain and Maps [J]. Energy Construction,2014, 1(1): 92-96.
[15] 朱明,全吉,黄剑眉,等. 国际工程项目费用风险量化评估与动态管控 [J]. 国际经济合作,2014, 29(5): 81-86.

ZHU Ming, QUAN Ji, HUANG Jianmei, et al. Quantitative Risk Assessment and Dynamic Control of Internatonal Engineering Project Cost [J]. Journal of International Economic Cooperation, 2014, 29(5): 81-86.