[1] 金熹卿,谢化一,倪季良,等. 高位收水冷却塔的设计[J] 中国电力,1993(6): 39-42.

JIN X Q, XIE H Y, NI J L,et al. The process design of the super high-level water collecting cooling tower[J]. Chinese Electric, 1993(6): 39-42.
[2] 赵云驰,侯燕鸿,王东海,等. 超大型高位收水冷却塔工艺设计探讨[J]. 给水排水,2009, 35(11): 69-72.

ZHAO Y C, HOU Y H, WANG D H, et al. Discussion of the process design of the super high-level water collecting cooling tower[J]. Water & Wastewater Engineering, 2009, 35(11): 69-72.
[3] 赵云驰,侯燕鸿,王东海,等. 超大型自然通风冷却塔工艺设计探讨[J]. 电力建设,2009, 30(10): 67-69.

ZHAO Y C, HOU Y H, WANG D H, et al. Discussion of the process design of the super natural draft wet cooling tower[J]. Electric Power Construction, 2009, 30(10): 67-69.
[4] 费全昌. 我国冷却塔应用现状及面临的挑战[J]. 勘测设计,2014, 2(4): 29-33.

FEI Q C. Applications and challenges of cooling tower in China[J]. Electric Power Survey & Design, 2014, 2(4): 29-33.
[5] 吴艳艳. 自然通风高位收水冷却塔三维热力特性的数值模拟与收水装置的优化研究 [D]. 济南:山东大学能源与动力工程学院,2015.