[1] |
李刚,王晓东,邓广义. 区域级综合能源系统多能耦合优化研究 [J]. 南方能源建设,2017,4(2):24-28.
LIG,WANGX D,DENGG Y. Multi-energy complementary optimization research on local area integrated energy system [J]. Southern Energy Construction,2017,4(2):24-28. |
[2] |
黄仙,郭睿. 一种电力市场环境下的电源规划多智能体模型 [J]. 电力系统保护与控制,2016,44(24):1-8.
HUANGX,GUOR. A multi-agent model of generation expansion planning in electricity market [J]. Power System Protection and Control,2016,44(24):1-8. |
[3] |
李荣昌. 电力体制改革背景下的电力系统规划设计思路 [J]. 山东工业技术,2018(16):178-179.
LIR C. Thinking on power system planning and design under the background of electric power system reform [J]. Industrial Technology of Shandong,2018(16):178-179. |
[4] |
澳大利亚能源市场委员会. 澳洲电力法:版本113 [S]. 悉尼:澳大利亚能源市场委员会出版,2018.
Australian Energy Market Commission. National Electricity Rules:Version 113 [S]. Sydney:AEMC,2018. |
[5] |
澳大利亚能源市场运营商.集成电力系统规划报告 [R/OL].澳大利亚:AEMO,2018:3(2018-07-17)[2019-09-17].https://www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan. https://www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan
Australian Energy Market Operator. Integrated system plan [R/OL].Australia:AEMO,2018:3(2018-07-17)[2019-09-17].https://www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan. https://www.aemo.com.au/Media-Centre/2018-Integrated-System-Plan |
[6] |
澳大利亚Trans Grid. 输电网年度规划报告 [R/OL]. 新南威尔士: Trans Grid,2018:1-6(2018-06-30)[2019-09-17].https://www.aer.gov.au/networks-pipelines/guidelines-schemes-models-reviews/transmission-annual-planning-report-guidelines. https://www.aer.gov.au/networks-pipelines/gui delines-schemes-models-reviews/transmission-annual-planning-report-guidelines
Trans Grid Australia. Transmission annual planning report [R/OL]. New South Wales:Trans Grid,2018:1-6(2018-06-30)[2019-09-17]. https://www.aer.gov.au/networks-pipelines/gui delines-schemes-models-reviews/transmission-annual-planning-report-guidelines. https://www.aer.gov.au/networks-pipelines/gui delines-schemes-models-reviews/transmission-annual-planning-report-guidelines |
[7] |
美国输电规划委员会.PJM手册14B:PJM地区输电网规划流程 [R/OL].USA:TPD,2018:22-23(2018-08-23)[2019-09-17].https://www.energy.gov/oe/services/electricity-policy-coordination -and-implementation/transmission-planning. https://www.energy.gov/oe/services/electricity-policy-coordination -and-implementation/transmission-planning
Transmission Planning Department. PJM Manual 14B:PJM region transmission planning process [R/OL]. USA:TPD,2018:22-23(2018-08-23)[2019-09-17]. https://www.energy.gov/oe/services/electricity-policy-coordination -and-implementation/transmission-planning. https://www.energy.gov/oe/services/electricity-policy-coordination -and-implementation/transmission-planning |
[8] |
加利福尼亚独立电力系统运营商委员会. 2017-2018输电规划 [R/OL]. California:ISO Board,2018:13-15(2018-05-22)[2019-09-17].http://www.caiso.com/Documents/Final2017-2018StudyPlan.pdf. http://www.caiso.com/Documents/Final2017-2018StudyPlan.pdf
Board CaliforniaISO. 2017-2018 Transmission plan [R/OL]. California:ISO Board,2018:13-15(2018-05-22)[2019-09-17].http://www.caiso.com/Documents/Final2017-2018StudyPlan.pdf. http://www.caiso.com/Documents/Final2017-2018StudyPlan.pdf |
[9] |
加利福尼亚独立电力系统运营商委员会. 输电经济型评估方法 [R/OL]. California:ISO Board,2004:1-10(2004-06-01)[2019-09-17].https://max.book118.com/html/2017/0418/100795897.shtm. https://max.book118.com/html/2017/0418/100795897.shtm
CaliforniaISO. Transmission economic assessment methodology [R/OL]. California:ISO Board,2004:1-10(2004-06-01)[2019-09-17].https://max.book118.com/html/2017/0418/100795897.shtm. https://max.book118.com/html/2017/0418/100795897.shtm |
[10] |
欧洲互联电网.十年输电网规划2018年执行报告 [R/OL]. Europe:ENTSO-E,2018:20-35(2018-03-01)[2019-09-17].https://tyndp.entsoe.eu/Documents/TYNDP%20documents/TYNDP 2018/consultation/Main%20Report/TYNDP2018_Executive%20Report.pdf. https://tyndp.entsoe.eu/Documents/TYNDP%20documents/TYNDP 2018/consultation/Main%20Report/TYNDP2018_Executive%20Report.pdf
The European Network for Transmission System Operators Electricity. TYNDP 2018 Executive Report [R/OL]. Europe:ENTSO-E,2018:20-35(2018-03-01)[2019-09-17] https://tyndp.entsoe.eu/Documents/TYNDP%20documents/TYNDP 2018/consultation/Main%20Report/TYNDP2018_Executive%20Report.pdf. https://tyndp.entsoe.eu/Documents/TYNDP%20documents/TYNDP 2018/consultation/Main%20Report/TYNDP2018_Executive%20Report.pdf |
[11] |
欧洲互联电网. 欧洲互联电网开发项目成本效益分析第二版指南 [R/OL]. Europe:ENTSO-E,2018:1-10(2018-09-27)[2019-09-17].https://tyndp.entsoe.eu/Documents/TYNDP%20documents/Cost%20 Benefit%20Analysis/2018-10-11-tyndp-cba-20.pdf. https://tyndp.entsoe.eu/Documents/TYNDP%20documents/Cost%20 Benefit%20Analysis/2018-10-11-tyndp-cba-20.pdf
The European Network for Transmission System Operators Electricity. 2nd ENTSO-E guideline for cost benefit analysis of grid development projects [R/OL]. Europe:ENTSO-E,2018:1-10(2018-09-27)[2019-09-17]. https://tyndp.entsoe.eu/Documents/TYNDP%20documents/Cost%20 Benefit%20Analysis/2018-10-11-tyndp-cba-20.pdf. https://tyndp.entsoe.eu/Documents/TYNDP%20documents/Cost%20 Benefit%20Analysis/2018-10-11-tyndp-cba-20.pdf |