      目的  定日镜场道路设计是塔式太阳能光热电站设计中不可缺少的环节,为降低电站初投资和提高定日镜场效率,科学、有效、合理进行道路设计。
      方法  将定日镜场的道路按性质和使用功能划分为四类:主通道道路、辐射道路、周边环形道路和定日镜间道路,对其在设计中需要考虑的各项因素进行详细分析,并分别从道路布置形式、结构设计、附属设施三个方面进行研究。
      结果  总结出定日镜场各类道路平面布置的原则和要求;提出路面结构设计要以满足功能使用要求,经济合理为前提,要着重考虑道路施工、当地地材、维修条件等因素;给出不同场地条件的定日镜间道路路面结构形式;同时提出在定日镜场内设置道路标识系统。
      结论  可对今后的定日镜场道路设计起一定的借鉴作用。

     

    Abstract: IntroductionRoad design for heliostat field is the important part in the design of solar power tower plant. To reduce power plant investment and improve the efficiency of heliostat field, road design shall be scientific, effective and reasonable.
      Method  In this paper, the roads of heliostat field were divided into four categories: main road, radiation road, peripheral ring road and inter-heliostat road. The factors to be considered in the design were analyzed in detail, and the road layout, structural design and ancillary facilities were studied respectively.
      Result  The principles and requirements of the road layout are summarized. It is proposed that the pavement structure design should be based on the functional requirements, economic rationality, construction, local material and maintenance conditions. The pavement structure of inter-heliostat road and the road sign system in heliostat field is suggested.
      Conclusion  The paper is used for reference in the road design for heliostat field in the future.

     

/

返回文章
返回