某核电站厂址道路抛石填筑路基强夯处理探讨
Discuss on Dynamic Compaction Treatment on Rubble Foundation in Coastal Road of Nuclear Power Plant
-
摘要: 为了处理滨海软土路基,使其承载力和压缩模量达到设计要求,结合现场工程地质条件,采用先抛填块石至一定标高,再采用强夯工艺对抛石进行处理,取得了良好的处理效果。通过对处理后地基所做的荷载试验、钻芯检测和沉降观测分析,路基经强夯处理后,承载力及变形均达到设计要求。强夯技术因设备简单,施工方便,经济易行,适应于处理抛石填筑后的埋深较浅的滨海软土地基。Abstract: When deal with the coastal silt foundation, according to the geologic and actual condition of the project, dynamic consolidation method on rubble foundation is qualified as practical. After dynamic compaction,the result of roadbed load test, drilled core test and settlement observation showed that the bearing capacity and settlement control of the roadbed can meet the design requirements. The result of the treatment is good. For dynamic dompaction is simple in equipment usage, convenient in construction and economical, it can be widely used in coastal silt riprapped foundation treatment.