  • 摘要: 为改进设计,提高中国抽水蓄能电站的建设管理水平,从水库库容、地下厂房抗振、渗漏、排水,高压隧洞充排水和安全监测系统等方面全面总结了广州蓄能水电厂20年的经验总结和教训。结果表明广州蓄能水电厂水工建筑物设计运行基本合理,但仍有一些值得改进的地方。

     

    Abstract: To improve the design and the construction management of the pumped-storage power stations in China, the article overall summarizes the experience and lessons of the Guangzhou Pumped-storage Power Station for 20 years from the aspects of reservoir capacity, underground anti-vibration, leakage, drainage, water drainage and filling in the high pressure tunnel and safety monitoring system. The results shown that the design and operation of the hydraulic structures in GPSPS are basically reasonable, but there are still some places worthy of improvement.

     

/