高级检索

对澳输电第三通道过十字门水道方案研究

Research on Crossing Scheme of Cross-gate Waterway for the Macao Third Power Transmission Channel

  • 摘要:
        目的   针对十字门水道穿越方案展开论述,由于受场地限制,以及横琴侧回填石的制约,穿越十字门水道只能采用拖拉管方案。
        方法   对管材回拖力、径向稳定性等关键控制指标进行充分对比,采用有限元等计算方法对管材径向稳定性进行验算。
        结果   计算表明:推荐采用MPP管,可满足安全性,同时也方便施工。
        结论   所提算法是正确并有效的,可为实际应用提供指导。

     

    Abstract:
        Introduction   This paper discusses the crossing scheme of cross-gate waterway. Due to the restriction of site and backfilling stone on the side of Hengqin, the only way to cross the Crossgate waterway is towing pipe.
        Method   In this paper, the key control indicators such as pullback force and radial stability of pipe were fully compared and the finite element method was used to check the radial stability of pipe.
        Result   The results show that MPP pipe is recommended to meet the safety requirements and facilitate construction.
        Conclusion   We demonstrate the feasibility of the calculation method, and this work provides some guidance for the practical application.

     

/