高级检索

燃煤电站除尘输灰一体化设计方案

Integration Design Scheme of Electrostatic Precipitator and Ash Conveying System in Coal-fired Power Station

  • 摘要:
      目的  为了减少输灰系统的初投资和运行费用。
      方法  介绍了某2×350 MW循环流化床电站工程采用电除尘大灰斗代替电站常规灰库,飞灰从电除尘器灰斗出口直接装车外运,不设灰库和气力输灰装置的工程实例。
      结果  两台炉共节约投资1 078万元,每年节省空压机运行电耗212万元,另外,减少了空压机的耗材和维护检修工作量。
      结论  采用除尘输灰一体化方案可以节省电站投资,降低运行费用。

     

    Abstract:
      Introduction  In order to reduce the investment and operation cost of ash conveying system coal-fired power plant
      Method  This paper introduces an engineering example of a 2×350 MW circulating fluidized bed power plant project, in which the large ash hopper of electrostatic precipitator is used to replace the conventional ash silo of the power plant, and the fly ash is directly loaded from the ash hopper outlet of the Electrostatic precipitator and transported outside without the ash silo and pneumatic ash conveying device.
      Result  The investment of the two unite save 10.78 million yuan, and the power consumption of the air compressor save 2.12 million yuan per year. In addition, the consumables and maintenance work of the air compressor are reduced.
      Conclusion  Integration design scheme of Electrostatic precipitator and ash convey ing system in coal-fired power station may save the investment and operation cost.

     

/