某1 000 MW机组采用烟风煤粉管道设计优化方案的实施效果验证

Verification of the Implementation Effect of the Optimization Design Scheme of Flue Gas,Air and Pulverized Coal Pipeline for a 1 000 MW Unit

  • 摘要:
      目的  烟风煤粉管道典型设计优化方案已经应用于多个工程,故文章拟进行设计优化前后的实施效果验证,以进一步完善典型优化方案体系。
      方法  以具体工程为例,采用了理论计算值与实际测试值的绝对值及差值对比的研究方法,进行了烟风煤粉管道理论压降与现场测试值的对比研究。
      结果  研究结果显示理论计算的优化效果会劣于实测值。
      结论  优化方案有利于降低烟风煤粉整个管道系统的阻力水平,故会使得实测实施效果由于理论计算值。研究成果对烟风煤粉管道的阻力计算具有一定的参考和借鉴意义。

     

    Abstract:
      Introduction  In order to optimize the typical design scheme of flue gas, air and pulverized coal pipeline, which had been applied in many projects, this paper planned to verify the implementation effect before and after the design optimization, so as to further improve the typical optimization scheme system for verification.
      Method  Taking a specific project as an example, this paper adopted the research method of comparing the absolute value and difference between the theoretical calculated value and the actual test value, and carried out a comparative study on the theoretical pressure drop and the field test value about air and flue gas duct as well as pulverized coal pipe.
      Result  The results showed that the optimization effect of theoretical calculation was inferior to the measured one.
      Conclusion  The optimization scheme was beneficial to reduce the resistance level of the whole pipe system, so it will make the actual implementation effect due to the theoretical calculation value. The research results of this paper has certain reference significance for the calculation of the resistance of flue gas, air and pulverized coal pipeline.

     

/