[1] 陈建东,王晶. 国外海上风电的发展现状、趋势与展望[J]. 世界科技研究与发展,2014,36(4):458-464.

CHEN J D,WANG J. The development,trend and prospect of offshore wind power abroad[J]. World Sci-Tech R & D,2014,36(4):458-464.
[2] 毕明君. 海上风机单桩基础选型设计方法[J]. 南方能源建设,2017,4(增刊1):56-61.

BI M J. Selection and design method of single pile foundation for offshore fan[J]. Southern Energy Construction,2017,4(Supp.1):56-61.
[3] 中华人民共和国交通运输部. JTS 167-4—2012,港口工程桩基规范 [S]. 北京:人民交通出版社,2012.
[4]

NAKAYAMA J, FUJISEKI Y. A pile load testing method: 1973-27007 [P]. 1973.
[5]

OSTERBERG J. New device for load testing driven piles drilled shaft separates friction and end bearing[J]. Pilingand Deep Foundations, 1989, 3: 421-427.
[6]

OSTERBERG J. The osterberg load test method for drilled shaft and driven piles [C]//7th International Conference Exhibit on Piling and Deep Foundations, Vienna, Austria, April 3-7, 1998:201-207.
[7]

NISHIMURA S. Pile capacity management by the application of Statnamic test loading text [C]//7th International Conference and Exhibition on Piling and Deep foundations, Vienna, Austria, April 3-7, 1998.[S.l.:s.n.],1998:15-18.
[8] 徐彬,易神州,张昆,等. 基于API规范的海上大直径钢管桩静压载试验分析[J]. 中国海洋大学学报,2017,47(10):134-140.

XU B,YI S Z,ZHANG K,et al. Static load test and analysis of offshore large-diameter steel pipe pile based on API code[J]. Journal of Ocean University of China,2017,47(10):134-140.
[9] 董淑海,陈锦剑,王建华. 大直径水下钢管桩竖向承载力的现场试验分析[J]. 土木工程学报,2007,40:228-232.

DONG S H,CHEN J J,WANG J H. Field test and analysis of vertical bearing capacity of large diameter underwater steel pipe pile[J]. China Civil Engineering Journal,2007,40:228-232.
[10] 朱照清,龚维明,戴国亮. 大直径钢管桩水平承载力现场试验研究[J]. 建筑科学,2010,26(9):36-39.

ZHU Z Q,GONG W M,DAI G L. Field test research on horizontal bearing capacity of large diameter steel pipe pile[J]. Architecture Science,2010,26(9):36-39.
[11] 石振明,宋晶. 光纤检测技术在海上钢管桩试桩中的应用[J]. 工程地质学报,2016,24(2):315-323.
[12] 梁迎宾. 某海上风电试桩工程施工管理浅析[J]. 中国水运,2015,15(6):138-139.

LIANG Y B. Analysis on construction management of a sea wind power test pile project[J]. China Water Transport,2015,15(6):138-139.
[13] 肖金品,彭文滔,胡春林,等. 基于桩身位移测量的自平衡试桩极限承载力确定方法[J]. 武汉理工大学学报,2013,35(8):103-107.

XIAO J P,PENG W T,HU C L,et al. Determination method of ultimate bearing capacity of self-balanced test pile based on pile displacement measurement[J]. Journal of Wuhan University of Technology,2013,35(8):103-107.
[14] 周明星,王鹏,程宝辉. 自平衡试桩法关键问题探讨[J]. 桥梁建设,2008(6):68-72.
[15] 聂如松,冷伍明,魏巍. 自平衡试桩法一种等效转换方法[J]. 岩土工程学报,2011,33(2):188-191.
[16] 朱向荣,汪胜忠,叶俊能,等. 自平衡试桩荷载传递模型及荷载-沉降曲线转换方法改进研究[J]. 岩土工程学报,2011,32(11):1717-1721.
[17] 柯洪,赵春宏,朱宾勤,等. 后压浆大直径超长钻孔灌注桩试桩工艺[J]. 施工技术,2015,44(7):90-98.
[18] 姚杰. 超长钻孔灌注桩试桩的监理监控重点[J]. 建设管理,2011(5):53-56.
[19] 邱世忠,王恕根. 75米超长钢管桩试桩实践[J]. 建筑施工,1985(1):18-23.
[20] 周龙. 砂土中海上风电超大直径钢管桩桩土相互作用研究 [D]. 天津:天津大学,2014.
[21] 江波,肖晶晶,严俊明. 我国海上风电施工能力分析[J]. 可再生能源,2007, 25(4):104-106.
[22] 张海亚,郑晨. 海上风电安装船的发展趋势研究[J]. 船舶工程,2016, 38(1):1-7.