孟宪珍. 20千伏及以下配网工程造价管理的实践与探索 [J]. 新疆电力技术,2012(113): 21-23+16.
MENG X Z. Practice and exploration of 20 kV & under distribution network project cost management [J]. Xinjiang Electric Power Technology,2012(113): 21-23+16. |
[2] |
刘宏志,屠庆波,韩延峰. 大数据环境下的电网工程造价分析管控体系研究 [J]. 华东电力,2014,42(12): 2722-2727.
LIU H Z, TU Q B, HAN Y F. Management and control system of grid project cost analysis based on big data [J]. East China Electric Power,2014,42(12): 2722-2727. |
[3] |
崔金栋,郑鹊,周念成,等. 基于大数据的智慧经济园区电网工程造价管理方法研究 [J]. 科技管理研究,2018,38(6): 166-174.
CUI J D, ZHENG Q, ZHOU N C,et al. Research on grid construction cost management methods of wisdom economic zone based on big data [J]. Science and Technology Management Research,2018,38(6): 166-174. |
[4] |
陈洁,刘刚刚,陈铭. 南方电网配网工程造价水平分析方法 [J]. 南方电网技术,2016,10(11): 79-83.
CHEN J, LIU G G, CHEN M. Analysis method of cost level of distribution network projects in China [J]. Southern Power System Technology,2016,10(11): 79-83. |
[5] |
张嘉裕. 配电网工程投资控制中标准化设计研究 [J]. 中国新技术新产品,2017(6): 128-129.
ZHANG J Y. Research on investment control standardization design of distribution network project [J]. China New Technologies and Products,2017(6): 128-129. |
[6] |
何佳,郑媛媛. 数据挖掘技术在配网工程造价管理中的应用 [J]. 电网技术,2017,35(增刊2): 9-13.
HE J, ZHENG Y Y. Application of data mining in cost management of distribution projects [J]. Power System Technology,2017,35(Supp.2): 9-13. |
[7] |
贺晨晨. 配网工程全寿命周期造价管理实证研究 [D]. 保定:华北电力大学,2015.
HE C C. Empirical study on distribution network project life-cycle cost management [D]. Baoding:North China Electric Power University,2015. |
[8] |
陈海涵. 电网公司生产项目规划及投资计划管理体系研究 [J]. 广东电力,2014,27(5): 44-50+98.
CHEN H H. Study on production project planning and investment plan management system of power grid corporation [J]. Guangdong Electric Power,2014,27(5): 44-50+98. |
[9] |
卢艳超,温卫宁,郑燕. 我国电网工程造价管理模式的发展与完善 [J]. 电力建设,2014,35(9): 123-127.
LU Y C, WEN W N, ZHENG Y. Development and perfection of cost management mode of power grid project in China [J]. Electric Power Construction,2014,35(9): 123-127. |
[10] |
吴强,孔庆捷. 基于代理型CM模式的抽水蓄能电站工程造价管理研究 [J]. 南方能源建设,2015,2(1): 104-109.
WU Q, KONG Q J. Research on the engineering cost management of pumped-storage power station project with agency CM mode [J]. Southern Energy Construction,2015,2(1): 104-109. |
[11] |
夏同令,张世浪. 综合管廊造价影响因素分析 [J]. 南方能源建设,2017,4(增刊1): 154-157.
XIA T L, ZHANG S L. Analysis on the factors affecting the cost of underground pipe gallery [J]. Southern Energy Construction,2017, 4(Supp.1): 154-157. |
[12] |
赵艳丽. 基于显著性理论的电力建设工程投资灰色预测 [J]. 南方能源建设,2014,1(1): 97-100.