[1] |
涂国富,梅生强. 大型电源总承包项目进度风险分析与控制 [J]. 南方能源建设,2017, 4 (2): 147-152.
TU G F, MEI S Q. Analysis and control of schedule risks of large power EPC projects [J]. Southern Energy Construction, 2017, 4 (2): 147-152. |
[2] |
鹿丽宁. 国际工程项目货物采购 [M]. 北京:中国建筑工业出版社,2010.
LU L N. Procurement in the international engineering project [M]. Beijing: China Architecture & Building Press, 2010. |
[3] |
武宇琼. 建设工程合同管理浅析 [J]. 工程项目管理. 2014, 19 (1): 25-27.
WU Q Y. Analyses on the contract management of the construction project [J]. Project Management, 2014, 19 (1): 25-27. |
[4] |
单卫平. 减少海外EPC项目现场紧急采购的对策 [J]. 石油化工设计,2012, 29(3): 58-59.
SHAN W P. Countermeasure to reduce urgent procurement on site of overseas EPC project [J]. Petrochemical Design, 2012, 29(3): 58-59. |
[5] |
杜瑾. ABC公司国际工程总承包项目采购风险管理研究 [D]. 北京:对外经济贸易大学,2015.
DU J. Research on procurement risk management of ABC overseas general contracting project [D]. Beijing: University of International Business and Economics, 2015. |
[6] |
姜亮亮,肖雨生. 某出口核电项目应急采购的执行概述 [J]. 科技传播,2016 (4): 108-109.
JIANG L L, XIAO Y S. Overview on urgent purchase execution of a overseas nuclear project [J]. Technology Broadcast, 2016(4): 108-109. |
[7] |
李可,黄忆箴. 谈对EPC工程设计变更的控制和管理 [J]. 建筑设计管理,2009, 12 (26): 20-21.
LI K, HUANG Y Z. Control and management on design alteration of EPC project [J]. Architectural Engineering Management, 2009, 12 (26): 20-21. |
[8] |
Project Management Institute. A guide to project management body of knowledge fifth edition [M]. USA: Project Management Institute, 2012. |
[9] |
SAMEER K, BOICE BROOKE C., Shepherd MARK J.. Risk assessment and operational approaches to manage risk in global supply chains [J]. Transportation Journal, 2013: 391-411. |