[1] |
李铁松,刘甲利,庄明振. 基于多代理的虚拟电厂协调优化调度策略研究 [J]. 广东电力,2016,29(8): 32-37.
LI T S, LIU J L, ZHUANG M Z. Research on coordinated and optimized dispatching strategy for virtual power plant based on multi-agent system [J]. Guangdong Electric Power,2016,29(8): 32-37. |
[2] |
王伟,徐婧,赵翔,等. 中国煤电机组调峰运行现状分析 [J]. 南方能源建设,2017,4(1): 18-24.
WANG W, XU J, ZHAO X,et al. Analysis on peak load regulation status quo for coal-fired power plants in China [J]. Southern Energy Construction,2017,4(1): 18-24. |
[3] |
刘吉臻,曾德良,田亮,等. 新能源电力消纳与燃煤电厂弹性运行控制策略 [J]. 中国电机工程学报,2015,35(21): 5385-5394.
LIU J Z, ZENG D L, TIAN L,et al. Control strategy for operating flexibility of coal-fired power plants in alternate electrical power systems [J]. Proceedings of the CSEE,2015,35(21): 5385-5394. |
[4] |
禤培正,雷佳,华栋,等. 消纳大规模风电的电力系统源荷协同调度 [J]. 广东电力,2016,29(8): 11-16.
XUAN P Z, LEI J, HUA D, et al. Source-load coordination dispatching for power system considering large-scale wind power accommodation [J]. Guangdong Electric Power,2016,29(8): 11-16. |
[5] |
郭颖,吕剑虹,张铁军. 热力过程控制系统多目标优化及其在机炉协调控制中的应用研究 [J]. 热力发电,2008,37(2): 35-42.
GUO Y, LV J H, ZHANG T J. Study on multi-objective optimization for control system of the thermal process and its application in boiler-tuebine coordinated control [J]. Thermal Power Generation,2008,37(2): 35-42. |
[6] |
刘吉臻,王琪,田亮,等. 供热机组负荷-压力简化模型及特性分析 [J]. 动力工程学报,2012,32(3): 192-196+228.
LIU J Z, WANG Q, TIAN L,et al. Simolified model and characteristic analysis of load-pressure object in heat supply units [J]. Journal of Chinese Society of Power Engineering,2012,32(3): 192-196+228. |
[7] |
高爱国,尚勇,康静秋. 提高自动发电控制性能指标的协调控制策略优化与应用 [J]. 热力发电,2012,41(12): 43-47.
GAO A G, SHANG Y, KANG J Q. Optimization and application of coordination control strategy for improving the agc performance [J]. Thermal Power Generation,2012,41(12): 43-47. |
[8] |
滕卫明,王春利,高海东,等. 应用于机炉协调控制的能量平衡与主汽压力调节相结合的控制策略 [J]. 热力发电,2005,34(6): 42-44+6.
TENG W M, WANG C L, GAO H D,et al. Control strategy of combining energy balance and main steam regulation for coordinated control of turbine and boiler [J]. Thermal Power Generation,2005,34(6): 42-44+6. |
[9] |
刘吉臻,邓拓宇,田亮. 负荷指令非线性分解与供热机组协调控制 [J]. 中国电机工程学报,2016,36(2): 446-452.
LIU J Z, DENG T Y, TIAN L. Nonlinear decomposition of load command and coordinated control for heat supply units [J]. Proceedings of the CSEE,2016,36(2): 446-452. |
[10] |
张锐锋,潘华,李小军,等. 制粉系统动态特性对协调控制系统的影响 [J]. 热力发电,2015,44(7): 78-82.
ZHANG R F, PAN H, LI X J,et al. Influence of dynamic characteristics of pulverizing system on coordinated control system [J]. Thermal Power Generation,2015,44(7): 78-82. |
[11] |
刘吉臻,田亮,曾德良,等. 660 MW机组负荷-压力非线性特性的分析 [J]. 动力工程,2005,25(4): 533-536+540.
LIU J Z, TIAN L, ZENG D L,et al. Analysis on the nonlinearity of load-pressure characteristics of a 660 MW unit [J]. Power Engineering,2005,25(4): 533-536+540. |
[12] |
王令存. 电站锅炉燃烧控制系统的优化策略 [D]. 太原:山西大学,2010.
WANG L C. Boiler combustion control system optimization [D]. Taiyuan:Shanxi University,2010. |
[13] |
何同祥,张华磊,李亚军. 300 MW机组DEB协调控制系统优化 [J]. 热力发电,2005(4): 44-46+57-65.
HE T X, ZHANG H L, LI Y J. Optimization of DEB coordinated control system for 300 MW unit [J]. Thermal Power Generation,2005(4): 44-46+57-65. |
[14] |
常太华,宋建锋,田亮. 汽包锅炉给水与负荷-压力耦合特性分析 [J]. 华北电力大学学报(自然科学版),2009,36(5): 56-60.
CHANG T H, SONG J F, TIAN L. The coupling characteristic analisis of drum-boiler feed water and load-pressure [J]. Journal of North China Electric Power University(Natural Science Edition),2009,36(5): 56-60. |
[15] |
张平,赵立,王振华,等. 600 MW机组高压调门典型事故分析及处理 [J]. 中国电业(技术版),2011(12): 41-44.
ZHANG P, ZHAO L, WANG Z H,et al. Typical accident analysis and treatment for high-pressure control valve in 600 MW power units [J]. China Electric Power(Technology Edition),2011(12): 41-44. |
[16] |
张锐锋,李小军,潘华,等. 两种亚临界机组负荷-压力简化模型对比及实验分析 [J]. 中国电力,2015,48(10): 23-27.
ZHANG R F, LI X J, PAN H,et al. Comparison and experiment analysis of two simplified load-pressure models of subcritical units [J]. Electric Power,2015,48(10): 23-27. |
[17] |
卫丹靖,田亮,边防,等. “机跟炉”协调控制系统参数整定规律研究 [J]. 华北电力大学学报(自然科学版),2016,43(6): 91-96.
WEI D J, TIAN L, BIAN F,et al. Rules of parameters setting for coordinated control system under turbine following boiler mode [J]. Journal of North China Electric Power University(Natural Science Edition),2016,43(6): 91-96. |
[18] |
田亮,曾德良,刘鑫屏,等. 500 MW机组简化的非线性动态模型 [J]. 动力工程,2004,24(4): 522-525.
TIAN L, ZENG D L, LIU X P,et al. A simplified non-linear dynamic model of 500 MW Unit [J]. Power Engineering,2004,24(4): 522-525. |