[1] 于俊岭,吴海洋,张轶,等. 海底电缆登陆浅滩防冲刷措施研究 [J]. 中国电业:(技术版),2014(10):85-88.

YUJ L,WUH Y,ZHANGY,et al. Research on scour-prevention measure for submarine cable landed shoal [J]. China Electric Power (Technology Edition),2014(10):85-88.
[2] 刘晓霞,高强,脱浩虎,等. 海底光电复合缆的落锚撞击试验与仿真研究 [J]. 石油机械,2017,45(1):62-69.

LIUX X,GAOQ,TUO H H,et al. Field test and numerical modeling of submarine photoelectric composite cable under anchor impact [J]. China Petroleum Machinery,2017,45(1):62-69.
[3] 苏荣,元国凯. 海上风电场海底电缆防护方案研究 [J]. 南方能源建设,2018,5(2):121-125.

SUR, YUANG K. Protection schemes of submarine power cables in offshore wind farm [J]. Southern Energy Construction,2018,5(2):121-125.
[4] 吴庆华,陈建康,郑伟,等. 中国首条500 kV海底电缆线路工程的设计 [J]. 中国电业:(技术版),2014(10):46-54.

WUQ H,CHENJ K,ZHENGW,et al. Design of the first 500 kV submarine cable line project in China [J]. China Electric Power (Technology Edition),2014(10):46-54.
[5] 张正祥,曾二贤,吴海洋,等. 海底电缆抛石堤坝洋流稳定性的试验研究 [J]. 电力勘测设计,2015(1):49-53+80.

ZHANGZ X,ZENGE X,WUH Y,et al. Experimental research on stability of jackstone dam under current action for protecting submarine cable [J]. Electric Power Survey & Design,2015(1):49-53+80.
[6]

WANGY D,WUH Y,SUNX M. Research on the depth of submarine cable laying in Hainan interconnection project [C]// Anon.China Electric Power Planning and Design Association,Power Transmission and Transformation Expert Committee 2014 Working Meeting,Beijing,China,August 6th,2014.Beijing:China Electric Power Planning and Design Association,2014:163-166.
[7]

VERITASDETNORSKE.Trawlboard/anchor penetration study for nexans [R]. Norway:Det Norske Veritas,2008.
[8] 高大钊.土力学与基础工程 [M].武汉理工大学出版社,2014.
[9] 周波. 双轴立式螺旋开沟机工作部件切土性能研究 [D]. 武汉:华中农业大学,2012.
[10] 张磊. 基于船舶应急抛锚的海底管道埋深及保护研究 [D]. 武汉:武汉理工大学,2013.
[11]

ALLANP G.Selecting appropriate cable burial depths – a methodology [C]//Anon.Submarine Cable Improvement Group,Conference Proceedings of IBC Submarine Communication 1999,Cannes,1999. Cannes:Submarine Cable Improvement Group,1999:16-18.
[12]

SLEEGERSJ, WURFFA. Hacking discussion in cannes [J]. Vakblad Voor De Bloemisterij, 2013, 68(1):30-31.
[13]

ALLANP G,COMRIER J,et al. The selection of appropriate burial tools and burial depths [C]// Anon.Submarine Cable Improvement Group,Conference Proceedings of IBC Submarine Communication 2001,Kyoto,2001.Kyoto:Submarine Cable Improvement Group,2001:1-8.
[14] 王迎松.锚泊贯入量的研究 [D]. 大连:大连海事大学,2015.
[15] 冯雅萍,李英,吴子昂. 船舶抛锚对浅水区埋置管道的损伤分析 [J]. 船海工程,2017,46(4):169-172.

FENGY P,LIY,WUZ A.Analysis of impact on submarine buried pipelines from dropped anchor in shallow water [J]. Ship and ocean engineering,2017,46(4):169-172.
[16] 张鹏杨,王瑛剑,柯超,等. 海缆路由区船锚贯入量的研究分析 [J]. 光通信技术,2016,40(10):60-62.

ZHANGP Y,WANGY J,KEC,et al. Research and analysis of anchor penetration on submarine cables route area [J]. 2016,40(10):60-62.