[1] |
刘鹤忠,叶勇健. 当前技术条件下火电机组最大单机容量的探讨 [J]. 电力建设,2011,32(2):67-70.
LIU H Z, YE Y J. Discussion on the largest possible capacity of thermal power unit under present technology level [J]. Electrical Power Construction,2011,32(2):67-70. |
[2] |
王东雷,张鹏. 1 200 MW等级超超临界机组可行性研究 [J]. 电力建设,2015,36(2):131-136.
WANG D L, ZHANG P,Feasibility study on 1 200 MW ultra-supercritical unit [J]. Electrical Power Construction,2015,36(2):131-136. |
[3] |
徐雪元. 1 200 MW超超临界参数锅炉的研制与开发 [J]. 电力建设,2010,31(3):60-62.
XU X Y,1 200 MW USC parameter boiler development [J]. Electrical Power Construction, 2010,31(3):60-62. |
[4] |
华洪. 西门子1 000 MW超超临界汽轮机的技术特点 [J]. 上海电力,2005(4):408.
HUA H,Technology features of Siemens 1 000 MW ultra-supercritical steam turbine [J]. Shanghai Electric,2005(4):408. |
[5] |
梅林波,沈红卫,王思玉. 620 ℃超超临界汽轮机机组新型高温转子钢的应用 [J]. 热力透平,2014,43(3):219-221.
MEI L B, SHEN H W, WANG S Y. Application of advanced rotor steel in 620 ℃ USC steam turbines [J]. Thermal Turbine,2014,43(3): 219-221. |
[6] |
刘明慧. 自主研发世界最大容量1 240 MW火电发电机 [J]. 电机技术,2014(3):31.
Liu M H. Independent research and development of the world's largest capacity 1 240 MW thermal power generator [J]. Motor Technology,2014(3):31. |
[7] |
石司默. 100%高压旁路对超超临界锅炉设计的影响 [J]. 锅炉制造,2016(5):21-24.
SHI S M. Influence of 100% high-pressure bypass to USC boiler design [J]. Boiler Manufacturing,2016(5):21-24. |
[8] |
范永春,霍沛强. 1 000 MW超超临界机组主厂房布置格局探讨 [J]. 电力勘测设计,2009(5):36-39.
FAN Y C, HE P Q. Discussion on main building layout of 1 000 MW ultra super critical unit [J]. Electric Power Survey & Design,2009(5):36-39. |
[9] |
马晓峰,李宏保. 1 000 MW汽轮机组单/双例高压加热器选型 [J]. 黑龙江电力,2008,30(6):450-452.
MA X F, LI H B. Selection of single row/double row high pressure heater for 1 000 MW unit [J]. Heilongjiang Electric Power,2008,30(6):450-452. |
[10] |
陈俊斌. 1 200 MW超超临界机组三壳体凝汽器的特点分析 [J]. 电站辅机,2016,37(3):11-13.
CHEN J B. Characteristic analysis of three shell condenser for 1 200 MW ultra supercritical power unit [J]. Power Station Auxiliary Equipment, 2016,37(3):11-13. |
[11] |
凌芳,霍沛强,邓成刚,等. 1 000 MW等级湿冷机组回热级数优化研究 [J]. 南方能源建设,2014,1(1):45-49.
LING F, HUO P Q, DENG C G,et al. Optimization of regenerative stage numbers for 1 000 MW wet cooling units [J]. Southern Energy Construction,2014,1(1):45-49. |