[1] |
苏欣新. 300 MW机组烟风系统设计和设备选型的几点体会 [J]. 电站系统工程,2003(6):64.
SUX X. Considerations about design and type selection of equipment for 300 MW unit flue gas & air system [J]. Power System Engineering,2003(6):64. |
[2] |
于飞,刘明,李卫东,等. 90°矩形截面弯头内置导流板的布置优化研究 [J]. 动力工程学报,2015,35(2):147-152.
YUF,LIUM,LIW D,et al. Layout optimization of guide plates in a 90 degree dlbow with rectangular cross section [J]. Journal of Chinese Society of Power Engineering,2015,35(2):147-152. |
[3] |
李鹏翔,宗保军,李原平,等. 100 MW机组锅炉烟风管道振动和风机积灰振动的消除 [J]. 热力发电,2003(6):66-67+1.
LIP X,ZONGB J,LIY P,et al. Elimination of vibration of boiler smoke and wind pipe and accumulated dust of fan for 100 MW unit [J]. Thermal Power Generation,2003(6):66-67+1. |
[4] |
赵全斌,薛朝囡,刘明,等. 火电厂烟风通道主要异形件优化研究 [J]. 工程热物理学报,2015,36(4):780-784.
ZHAOQ B,XUEZ N,LIUM,et al. Optimization on main types of major irregular parts for air & flue gas ducts in thermal power plant [J]. Journal of Engineering Thermophysics,2015,36(4):780-784. |
[5] |
叶兴联,李立锋,章华熔,等. 低低温电除尘器烟风道流线型设计与分析 [J]. 环境工程学报,2018,12(11):3274-3280.
YEX L,LIL F,ZHANGH R,et al. Design and analysis of streamlined shape flue gas duct for low-low temperature electrostatic precipitator [J]. Chinese Journal of Environmental Engineering,2018,12(11):3274-3280. |
[6] |
王俊启. 1 025 t/h锅炉风烟系统改造对厂用电率的影响 [J]. 热力发电,2003(10):50-52+97.
WANGJ Q. The influence of 1 025 t/h boiler air and flue system transformation on the power consumption rate of the plant [J]. Thermal Power Generation,2003(10):50-52+97. |
[7] |
翟德双. 降低燃煤电厂厂用电率技术分析 [J]. 中国电力,2015,48(3):9-12.
ZHAID S. Technical analysis on auxiliary power ratio reduction in coal-fired power plants [J]. Electric Power,2015,48(3):9-12. |
[8] |
邢希东. 600 MW火电机组降低厂用电率措施 [J]. 中国电力,2007(9):60-64.
XINGX D. Countermeasures to reduce the auxiliary power consumption rate of 600 MW thermal power units [J]. Electric Power,2007(9):60-64. |
[9] |
赵鹏,龙辉,陶叶. 我国超(超)l临界燃煤机组节能环保设计技术策略分析 [J]. 电力建设,2012,33(4):54-57.
ZHAOP,LONGH,TAOY. Strategy analysis for energy saving and environmental protection design of ultra supercritical coal-fired unit in China [J]. Electric Power Construction,2012,33(4):54-57. |
[10] |
聂君,刘钢. 估算厂用电率的负荷率法 [J]. 中国电力,2013,46(9):44-46+55.
NIEJ,LIUG. Estimation of auxiliary power consumption rate with load ratio method [J]. Electric Power,2013,46(9):44-46+55. |