[1] |
卢毓欣, 赵晓斌, 李岩, 等. 海上风电送出用柔性直流换流站电气主接线 [J]. 南方电网技术, 2020, 14(12): 25-31. DOI: 10.13648/j.cnki.issn1674-0629.2020.12.004.
LU Y X, ZHAO X B, LI Y, et al. Main electrical connection of VSC-HVDC converter stations for offshore wind farm integration [J]. Southern Power System Technology, 2020, 14(12): 25-31. DOI: 10.13648/j.cnki.issn1674-0629.2020.12.004. |
[2] |
李飞飞, 王亮, 齐立忠, 等. 海上风电典型送出方案技术经济比较研究 [J]. 电网与清洁能源, 2014, 30(11): 140-144. DOI: 10.3969/j.issn.1674-3814.2014.11.028.
LI F F, WANG L, QI L Z, et al. Technical and economical comparisons of typical transmission schemes of the offshore wind farm [J]. Power Grids and Clean Energy, 2014, 30(11): 140-144. DOI: 10.3969/j.issn.1674-3814.2014.11.028. |
[3] |
王鑫, 王海云, 王维庆. 大规模海上风电场电力输送方式研究 [J]. 电测与仪表, 2020, 57(22): 55-62. DOI: 10.19753/j.issn1001-1390.2020.22.008.
WANG X, WANG H Y, WANG W Q. Research on power transmission mode of large-scale offshore wind farms [J]. Electrical Measurement & Instrumentation, 2020, 57(22): 55-62. DOI: 10.19753/j.issn1001-1390.2020.22.008. |
[4] |
申安, 董剑敏, 李露阳. ±800 kV换流站造价结构及投资水平分析 [J]. 南方能源建设, 2020, 7(3): 119-124. DOI: 10.16516/j.gedi.issn2095-8676.2020.03.016.
SHEN A, DONG J M, LI L Y. Analysis on cost structure and investment level of ±800 kV converter stations [J]. Southern Energy Construction, 2020, 7(3): 119-124. DOI: 10.16516/j.gedi.issn2095-8676.2020.03.016. |
[5] |
李园园, 张平朗. ±800 kV特高压直流输电线路工程造价结构及投资水平分析 [J]. 电网技术, 2011, 35(2): 21-25.
LI Y Y, ZHANG P L. Analysis on cost and investment level of ±800 kV UHVDC transmission projects [J]. Power System Technology, 2011, 35(2): 21-25. |
[6] |
吴海飞, 刘景华, 王雷广, 等. 海底电缆工程造价影响因素分析 [J]. 中国电力企业管理, 2021(6): 72-74. DOI: 10.3969/j.issn.1007-3361.2021.06.035.
WU H F, LIU J H, WANG L G, et al. Analysis on influencing factors of submarine cable project cost [J]. China Power Enterprise Management, 2021(6): 72-74. DOI: 10.3969/j.issn.1007-3361.2021.06.035. |
[7] |
王磊, 尚奎. 海缆线路清单计价项目和计算规范 [J]. 中国电力企业管理, 2019(12): 72-74. DOI: 10.3969/j.issn.1007-3361.2019.12.034.
WANG L, SHANG K. Specification for list valuation items and calculation of submarine cable lines [J]. China Power Enterprise Management, 2019(12): 72-74. DOI: 10.3969/j.issn.1007-3361.2019.12.034. |
[8] |
叶子菀, 夏华丽, 谢锡飞. 海缆工程专业工程量清单计价存在问题及对策 [J]. 项目管理评论, 2020(2): 54-56.
YE Z W, XIA H L, XIE X F. Problems and countermeasures for valuation with bill of quantities of submarine cable engineering [J]. Project Management Review, 2020(2): 54-56. |
[9] |
刘丽萍, 郑红星, 林庆扬. 柔性直流输电工程造价分析与控制 [J]. 能源与环境, 2016(6): 48+51. DOI: 10.3969/j.issn.1672-9064.2016.06.023.
LIU L P, ZHENG H X, LIN Q Y. Cost analysis and control of flexible DC transmission project [J]. Energy and Environment, 2016(6): 48+51. DOI: 10.3969/j.issn.1672-9064.2016.06.023. |
[10] |
国家能源局. 海上风电场工程设计概算编制规定及费用标准: NB/T 31009—2019 [S]. 北京: 中国水利水电出版社, 2019.
National Energy Administration. Preparation regulation for cost estimation of offshore wind power projects: NB/T 31009-2019 [S]. Beijing: China Water & Power Press, 2019. |
[11] |
国家能源局. 电网工程建设预算编制与计算规定(2018年版) [M]. 北京: 中国电力出版社, 2018.
National Energy Administration. Preparation regulation for cost estimation of power grid projects (2018 edition) [M]. Beijing: China Electric Power Press, 2018. |
[12] |
田晓焕. 海上风电项目建设成本分析及造价管理 [J]. 中国集体经济, 2020(34): 155-156.
TIAN X H. Construction cost analysis and cost management of offshore wind power projects [J]. China Collective Economy, 2020(34): 155-156. |
[13] |
周胡, 李书兴, 张大勇, 等. 近海风机浮托安装的总体过程 [J]. 船舶工程, 2020, 42(增刊1): 538-541. DOI: 10.13788/j.cnki.cbgc.2020.S1.124.
ZHOU H, LI S X, ZHANG D Y, et al. The overall process of floating installation for offshore wind turbine [J]. Ship Engineerin, 2020, 42(Supp. 1): 538-541. DOI: 10.13788/j.cnki.cbgc.2020.S1.124. |
[14] |
吴尚, 胡斌, 涂传彬. 海上换流站浮托法安装关键技术及应用 [J]. 人民长江, 2020, 51(增刊2): 226-229+284. DOI: 10.16232/j.cnki.1001-4179.2020.S2.059.
WU S, HU B, TU C B. Key technology and application of floating support installation in offshore converter station [J]. Changjiang River, 2020, 51(Supp. 2): 226-229+284. DOI: 10.16232/j.cnki.1001-4179.2020.S2.059. |
[15] |
刘晋超. 海上风电施工窗口期对施工的重要性 [J]. 南方能源建设, 2019, 6(2): 16-18. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.003.
LIU J C. Importance of window phase for offshore wind power construction [J]. Southern Energy Construction, 2019, 6(2): 16-18. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.003. |