[1] LAWRENCE P L. Critical Chain Project Management [M]. 2nd Revised Edition,Artech House,Inc. Norwood, MA. 2005.
[2] THOMAS G L,BOAZ R,EDWARD A S. Critical Chain:A New Project Management Paradigm or Old Wine in New Bottles [J]. Engineering Management Journal,2005,17(4):46-47.
[3] 古剑锋. 基于关键链的IT软件项目进度管理应用研究 [D]. 广州:中山大学,2011.

GU Jianfeng, Research of IT Project Time Management based on Critical Chain [D]. Guangzhou: Zhongshan University,2011.
[4] 高德拉特. 关键链 [M]. 罗嘉颖,译. 北京:电子工业出版社,2006.

GOLDRATT E. Critical Chain [M]. Translated by LUO Jiaying. Beijing:Electronic Industrial Press, 2006.
[5]

PARKINSON C N. Parkinson′s Law in the pursuit of progress[M]. London,UK:Penguin Books, 1947.
[6]

GLADSTONES W H, REGAN M A, LEE R B. Division of Attention: The Single-channel Hypothesis Revisited [J]. Quarterly Journal of Experimental Psychology: Human Experimental Psychology, 1989, 41(A): 1-17.
[7] 李波,翁东风,韦灼彬. 工程进度控制关键链法应用分析 [J]. 工程管理学报,2012, 26(3):71-74.

LI Bo,WENG Dongfeng,WEI Zhuobin. Analysis of Program Schedule Control Based on Critical Chain [J]. Journal of Engineering Management, 2012, 26(3):71-74.
[8] 高攀. 基于关键链的多项目管理的研究 [D]. 合肥:中国科技大学,2012:33-34.

GAO Pan. Research of Multi-project Management Based on Critical Chain [D]. Hefei:University of Science and Technology of China, 2012:33-34.