[1] |
浙江大学直流输电编写组. 直流输电 [M]. 北京:中国电力出版社,1982.
Zhejiang University DC Transmission Writing Group. Direct current transmission [M]. Beijing:China Electric Power Press,1982. |
[2] |
赵畹君. 高压直流输电工程技术 [M]. 北京:中国电力出版社,2004.
ZHAO W J. High-voltage direct current transmission engineering technology [M]. Beijing:China Electric Power Press,2004. |
[3] |
中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会. 高压直流输电晶闸管阀设计导则:GB/Z 30424—2013 [S]. 北京:中国计划出报社,2013.
General Administration of Quality Supervision, Inspection and Quarantine of the People′s Republic of China, China National Standardization Administration Committee. Design guidelines for high-voltage DC transmission thyristor valves: GB/Z 30424—2013 [S]. Beijing:China Planning Press,2013. |
[4] |
汤广福. 电力系统电力电子及其试验技术 [M]. 北京:中国电力出版社,2015.
TANG G F.Power system power electronics and its test technology [M]. Beijing:China Electric Power Press,2015. |
[5] |
刘杰,张静,曹均正,等. 直流输电换流阀阻尼系统特性研究 [J]. 中国电机工程学报,2012,32(30): 16-22+5.
LIU J, ZHANG J, CAO J Z, et al. Research on characteristics of damping system of DC transmission converter valve [J]. Proceeding of the CESS,2012,32(30): 16-22+5. |
[6] |
岳珂,孙玮,刘隆晨,等. 载流子寿命与高压晶闸管反向恢复特性的关系 [J]. 高电压技术,2017,43(12): 3944-3949.
QIU K, SUN W, LIU L C,et al. Correlation between carrier lifetime and reverse recovery characteristics of high power thyristors [J]. High Voltage Engineering,2017,43(12): 3944-3949. |
[7] |
郭焕,汤广福,于海玉,等. 高压直流输电晶闸管阀开通的电流应力分析 [J]. 中国电机工程学报,2011,31(15): 1-7.
GUO H, TANG G F, YU H Y,et al. Analysis of turn-on current stress on HVDC thyristor valve [J]. Proceeding of the CESS,2011,31(15): 1-7. |
[8] |
郭焕,温家良,汤广福,等. 高压直流输电晶闸管阀关断的电压应力分析 [J]. 中国电机工程学报,2010,30(12): 1-6.
GUO H, WEN J L, TANG G F,et al. Analysis of turn-off voltage stress on HVDC thyristo valve [J]. Proceeding of the CESS,2010,30(12): 1-6. |
[9] |
汤广福,贺之渊,邓占锋. 基于器件物理特性的晶闸管阀串联机制系统化研究 [J]. 中国电机工程学报,2006,26(12): 39-44.
TANG G F, HE Z Y, DENG Z F. Systematic study on valves series mechanism based on devices physical properties [J]. Proceeding of the CESS,2006,26(12): 39-44. |
[10] |
姚斌,施世鸿,陈荔. ±1 100 kV特高压直流换流站直流场导体的电磁计算与设计选型 [J]. 南方能源建设,2016,3(4): 37-41.
YAO B, SHI S H, CHEN L. Electromagnetic environment calculation and design of ±1 100 kV DC conductor in UHVDC converter station [J]. Southern Energy Construction,2016,3(4): 37-41. |
[11] |
李志平. 高压直流输电系统解锁过程的原理分析 [J]. 南方电网技术,2016,10(4): 284.
LI Z P. Principle analysis of deblocking process of HVDC transmission system [J]. Southern Power System Technology [J]. 2016,10(4): 284. |
[12] |
李志平.高压直流开路电压建立过程分析 [J]. 南方电网技术,2014,8(3): 37-41.
LI Z P. Analysis of the establishment process of high voltage DC open circuit voltage [J]. Southern Power System Technology [J]. 2014,8(3): 37-41. |
[13] |
李泰,荆雪记,孔令凯,等. 高压直流输电系统开路试验原理分析与工程建议 [J]. 电力系统保护与控制,2015,43(11): 134-141.
LI T, JING X J, KONG L K,et al. Principle analysis and engineering suggestions for open circuit test of HVDC transmission system [J]. Power System Protection and Control,2015,43(11): 134-141. |
[14] |
李侠,陈干. 高压直流输电开路试验中换流阀设备保护的探讨 [J]. 高压电器,2012,48(3): 86-89.
LI X, CHEN G. Discussion on protection of converter valve equipment in open circuit test of HVDC transmission [J]. High Voltage Apparatus,2012,48(3): 86-89. |
[15] |
李少华,刘涛,苏匀,等. ±800 kV特高压直流输电系统解锁/闭锁研究 [J]. 电力系统保护与控制,2010,38(6): 84-87.
LI S H, LIU T, SU Y,et al. Research on de-bocking/blocking operation in ±800 kV UHVDC transmission system [J]. Power System Protection and Control,2010,38(6): 84-87. |
[16] |
霍鹏飞,王国功,刘敏,等. 向上±800 kV特高压直流输电工程的直流保护闭锁策励略 [J]. 电力系统保护与控制,2011,39(9): 137-139+144.
HUO P F, WANG G G, LIU M,et al. DC protection lock strategy for Xiangjiaba-Shanghai ±800 kV UHV DC transmission project [J]. Power System Protection and Control,2011,39(9): 137-139+144. |