[1] |
戈志华, 杨佳霖, 何坚忍, 等. 大型纯凝汽轮机供热改造节能研究 [J]. 中国电机工程学报, 2012, 32(17): 25-30. DOI: 10.13334/j.0258-8013.pcsee.2012.17.019.
GE Z H, YANG J L, HE J R, et al. Energy saving research of heating retrofitting for large scale condensing turbine [J]. Proceedings of the CSEE, 2012, 32(17): 25-30. DOI: 10.13334/j.0258-8013.pcsee.2012.17.019. |
[2] |
柴国旭, 郑莆燕, 张跃进, 等. 凝汽式机组工业供热改造方案分析和比较 [J]. 浙江电力, 2012, 31(1): 32-34. DOI: 10.19585/j.zjdl.2012.01.009.
CHAI G X, ZHENG P Y, ZHANG Y J, et al. Analysis and comparison of industrial heat supply retrofit schemes for condensing unit [J]. Zhejiang Electric Power, 2012, 31(1): 32-34. DOI: 10.19585/j.zjdl.2012.01.009. |
[3] |
黎林村. 纯凝电厂工业供热改造方案设计 [J]. 区域供热, 2015(3): 27-30. DOI: 10.16641/j.cnki.cn11-3241/tk.2015.03.024.
LI L C. Analysis and comparison of industrial heating transformation schemes of condensing units design of industrial heating transformation scheme of pure condensing power plant [J]. District Heating, 2015(3): 27-30. DOI: 10.16641/j.cnki.cn11-3241/tk.2015.03.024. |
[4] |
林隆. 东方电厂350 MW超临界纯凝机组工业供热改造 [J]. 热力透平, 2020, 49(4): 281-283,314. DOI: 10.13707/j.cnki.31-1922/th.2020.04.008.
LIN L. Industrial heating retrofit of 350 MW supercritical pure condensing unit in Dongfang power plant [J]. Thermal Turbine, 2020, 49(4): 281-283,314. DOI: 10.13707/j.cnki.31-1922/th.2020.04.008. |
[5] |
吴斌, 邵志跃, 胡欣, 等. 215 MW机组工业抽汽供热改造 [J]. 热力发电, 2015, 44(5): 87-90. DOI: 10.3969/j.issn.1002-3364.2015.05.087.
WU B, SHAO Z Y, HU X, et al. Heat supply transformation for four 215 MW units using steam extraction [J]. Thermal Power Generation, 2015, 44(5): 87-90. DOI: 10.3969/j.issn.1002-3364.2015.05.087. |
[6] |
吴畅, 唐树芳, 张祎. 600 MW超临界机组工业供热改造分析 [J]. 能源与节能, 2018(5): 68-69,128. DOI: 10.3969/j.issn.2095-0802.2018.05.030.
WU C, TANG S F, ZHANG Y. Industrial heating transformation analysis of 600 MW supercritical unit [J]. Energy and Conservation, 2018(5): 68-69,128. DOI: 10.3969/j.issn.2095-0802.2018.05.030. |
[7] |
李小龙. 压力匹配器在某百万供热机组中的运用 [J]. 热力透平, 2017, 46(3): 184-189. DOI: 10.13707/j.cnki.31-1922/th.2017.03.007.
LI X L. Application of pressure adapter in a 1 000 MW heat supply unit [J]. Thermal Turbine, 2017, 46(3): 184-189. DOI: 10.13707/j.cnki.31-1922/th.2017.03.007. |
[8] |
张利平, 张晓杰, 刘帅. 330 MW机组供热改造的研究分析 [J]. 汽轮机技术, 2018, 60(6): 464-466,470. DOI: 10.3969/j.issn.1001-5884.2018.06.017.
ZHANG L P, ZHANG X J, LIU S. Research and analysis of heat supply modification of 330 MW unit [J]. Turbine Technology, 2018, 60(6): 464-466,470. DOI: 10.3969/j.issn.1001-5884.2018.06.017. |
[9] |
李凯, 张蕊. 利用压力匹配器研究联合循环电站供热方案 [J]. 能源与节能, 2014(1): 64-66. DOI: 10.3969/j.issn.2095-0802.2014.01.026.
LI K, ZHANG R. Heating method research of combined cycle plant by pressure matcher [J]. Energy and Energy Conservation, 2014(1): 64-66. DOI: 10.3969/j.issn.2095-0802.2014.01.026. |
[10] |
李靖, 陈海, 刘健, 等. 基于背压小汽轮机方案的大型燃煤电站供热改造 [J]. 热力发电, 2019, 48(2): 132-136. DOI: 10.19666/j.rlfd.201807137.
LI J, CHEN H, LIU J, et al. Heating retrofit for large-scale coal-fired power stations based on small back-pressure turbine scheme [J]. Thermal Power Generation, 2019, 48(2): 132-136. DOI: 10.19666/j.rlfd.201807137. |
[11] |
余炎, 金益波, 杨红霞, 等. 超临界350 MW机组采用背压式给水泵小汽轮机工业供热研究 [J]. 动力工程学报, 2018, 38(10): 849-854. DOI: 10.3969/j.issn.1674-7607.2018.10.012.
YU Y, JIN Y B, YANG H X, et al. Study on taking backpressure BFPT exhaust of 350 MW supercritical unit as industrial heat source [J]. Journal of Chinese Society of Power Engineering, 2018, 38(10): 849-854. DOI: 10.3969/j.issn.1674-7607.2018.10.012. |
[12] |
许啸, 唐磊, 周传文, 等. 330 MW燃煤机组工业供热中增加背压式汽轮发电机组的改造 [J]. 发电设备, 2020, 34(6): 434-438. DOI: 10.19806/j.cnki.fdsb.2020.06.014.
XU X, TANG L, ZHOU C W, et al. Heating retrofit of 330 MW coal-fired units by adding a back-pressure turbo-generator set [J]. Power Equipment, 2020, 34(6): 434-438. DOI: 10.19806/j.cnki.fdsb.2020.06.014. |
[13] |
孙士恩, 高新勇, 庞建锋. 工业抽汽机组供热改造的变工况热经济性分析 [J]. 汽轮机技术, 2016, 58(4): 301-304. DOI: 10.3969/j.issn.1001-5884.2016.04.019.
SUN S E, GAO X Y, PANG J F. Economic analysis on the variable condition of industrial extraction unit for heating rebuilding [J]. Turbine Technology, 2016, 58(4): 301-304. DOI: 10.3969/j.issn.1001-5884.2016.04.019. |
[14] |
张军辉, 杜献伟, 张文涛. 300 MW纯凝机组供热改造经济性分析 [J]. 发电技术, 2019, 40(1): 71-73. DOI: 10.12096/j.2096-4528.pgt.18068.
ZHANG J H, DU X W, ZHANG W T. Economic analysis of heating reform of 300 MW condensing power plant [J]. Power Generation Technology, 2019, 40(1): 71-73. DOI: 10.12096/j.2096-4528.pgt.18068. |
[15] |
何晓红, 高新勇, 陈菁, 等. 600MW超临界纯凝机组改供热的技术经济性分析 [J]. 发电与空调, 2017, 38(6): 24-27. DOI: 10.3969/J.ISSN.2095-3429.2017.06.006.
HE X H, GAO X Y, CHEN J, et al. Technical and economic analysis of the alteration from 600 MW supercritical condensing power to co-generation unit [J]. Refrigeration Air Conditioning & Electric Power Machinery, 2017, 38(6): 24-27. DOI: 10.3969/J.ISSN.2095-3429.2017.06.006. |