[1] 王沛迪,王雪涛,刘予,等. 火电厂湿法脱硫“石膏雨”成因分析与防治措施 [J]. 上海电力学院学报,2014,30(3):283-286.

WANG P D,WANG X T,LIU Y,et al. Cause analysis and control measure of gypsum rain of wet flue gas desulfurization in coal-fired power plants [J]. Journal of Shanghai University of Electric Power,2014,30(3):283-286.
[2] 周洪光,李延兵. 火电厂湿法脱硫石膏雨和白雾治理措施及效果分析 [J]. 电力科技与环保,2014,30(6):34-37.

ZHOU H G,LI Y B. Control measures and effect of gypsum rain and mist in thermal power plant with FGD [J]. Electric Power Technology and Environmental Protection,2014,30(6):34-37.
[3] 陈莲芳,徐夕仁,马春元,等. 湿式烟气脱硫过程中白烟的产生及防治 [J]. 发电设备,2005,30(5):326-328.

CHEN L F,XU X R,MA C Y,et al. Formation of white smoke in wet flue gas desulfurization processes and ways of prevention [J]. Power Equipment,2005,30(5):326-328.
[4] 李占元,孙月,杨建兴,等. 台山发电厂600 MW机组以二次热风加热脱硫后净烟气技术的研究 [J]. 广东电力,2008,21(8):35-38+42.

LI Z Y,SUN Y,YANG J X,et al. Research on heating desulfurized flue gas by secondary hot air of 600 MW unit in Taishan power plant [J]. Guangdong Electric Power,2008,21(8):35-38+42.
[5] 薛宁,印旭洋,王春昌. 热一次风加热器与低压省煤器的联合应用 [J]. 热力发电,2015,44(2):64-68.

XUE N,YIN X Y,WANG C C. Combined application of hot primary air heater and low pressure economizer [J]. Thermal Power Generation,2015,44(2):64-68.
[6] 杨勇平,黄圣伟,徐钢,等. 电站锅炉烟气余热利用系统的热力学分析和优化 [J]. 华北电力大学学报(自然科学版),2014,41(1):78-83.

YANG Y P,HUANG S W,XU G,et al. Thermodynamic analysis and optimization of the waste heat recovery system for utility boiler [J]. Journal of North China Electric Power University(Natural Science Edition),2014,41(1):78-83.
[7] 李秀平,李博,谢津伦. 燃煤锅炉低温余热利用技术应用分析 [J]. 中国电力,2011,44(12):86-88+96.

LI X P,LI B,XIE J L. Application of low-temperature waste heat utilization technology in coal-fired boiler [J]. Electric Power,2011,44(12):86-88+96.
[8] National Energy Administration. Technical code for design and calculation system of fossil-fired power plant:DL/T 5240—2010 [S]. Beijing:China Electric Power Press,2010:70-73.
[9] 马有福,杨丽娟,吕俊复. 联合旁通烟道与暖风器的锅炉烟气余热利用系统 [J]. 中国电机工程学报,2017,37(18):5359-5366+5535.

MA Y F,YANG L J,LÜ J F. Analysis of an exhaust heat recovery process of integrating bypass flue and condensate air heater for efficient power generation [J]. Proceedings of the CSEE,2017,37(18):5359-5366+5535.