[1] |
高峰,杨锡运,王伟,等. 基于测风塔测风数据的风电机组机舱风速修正 [J]. 系统仿真学报,2016(11):2790-2797.
GAO F, YANG X Y, WANG W,et al. Model wind speed correction of wind turbine based on wind measurement data of wind tower [J]. Journal of System Simulation,2016(11):2790-2797. |
[2] |
高婕,王健,崔永锋,等. 基于陕北某复杂地形风电场Windsim软件数值模拟研究 [J]. 风能,2016(10):62-64.
GAO J, WANG J, CUI Y F,et al. Numerical simulation of windsim software based on a complex terrain wind farm in Northern Shanxi [J]. Wind Energy,2016(10):62-64. |
[3] |
卢胜,吴莎. 基于SCADA数据的风电场后评估方法 [J]. 电子测试,2016(1):41-43.
LU S, WU S. Post-evaluation method of wind farm based on SCADA data [J]. Electronic Testing,2016(1):41-43. |
[4] |
刘凯,曾杰,叶任时,等. 复杂地形山地风电场的CFD分析 [J]. 人民长江,2016(3):56-58+102.
LIU K, ZENG J, YE R S,et al. CFD analysis of complex terrain mountain wind farms [J]. Yangtze River,2016(3):56-58+102. |
[5] |
迟继峰,钟天宇,刘庆超,等. 复杂地形多测风塔综合地貌及风切变拟合修正的风资源评估方法研究 [J]. 华电技术,2012(11):75-77+81.
CHI J F, ZHONG T Y, LIU Q C,et al. Study on wind resource evaluation method of synthetic landform and wind shear fitting in complex terrain [J]. Huadian Technology,2012(11):75-77+81. |
[6] |
王有禄,李淑华,宋飞. 风电场测风数据的验证和处理方法 [J]. 电力勘测设计,2009(1):60-66.
WANG Y L, LI S H, SONG F. Treatment method and inspection of anemometric dates in wind power plant [J]. Electric Power Survey & Design,2009(1):60-66. |
[7] |
国际电工委员会. 风力涡轮机,第1部分设计要求:IEC 61400-1-2007 [S]. 美国:国际电工委员会,2007.
IEC/TC. Wind turbines-part 1, design requirements: IEC 61400-1-2007 [S]. U.S.A.: IEC/TC, 2007. |
[8] |
国际电工委员会. 风轮,第12部分风轮发电的动力性能测试:DIN EN 61400-12-1-2007 [S]. 美国:国际电工委员会,2007.
IEC/TC.Wind turbine-Part 12, test for dynamic performance of wind turbine power generation: DIN EN 61400-12-1-20075 [S]. U.S.A.: IEC/TC, 2007. |