[1] |
刘金砺. 建筑桩基技术规范应用手册 [M]. 北京:中国建筑工业出版社,2010.
LIU Jinli. Application Manual of Technical Code for Building Pile Foundation [M]. Beijing: China Architecture & Building Press, 2010. |
[2] |
JGJ 94—2008,建筑桩基技术规范[S]. |
[3] |
张凤英,张发军. 钻孔灌注桩施工常见的质量缺陷及防治 [J]. 青海交通科技,2007(5):15-20.
ZHANG Fengying, Zhang Fajun. Common Construction Quality Defect of Drilling Bored Pile and Prevention Measure [J]. Qinghai Communication Technology, 2007(5):15-20. |
[4] |
何既荣,王书军. 钻孔灌注桩桩芯渗水的原因及预防处理措施 [J]. 科技创新导报,2007(33):166.
HE Jirong, WANG Shujun. Cause and Prevention of the Water Leakage of the Drilling Bored Pile Core [J]. Science and Technology Innovation Herald, 2007(33):166. |
[5] |
蒋小刚. 灌注桩桩顶渗水原因分析及控制措施 [J]. 中国高新技术企业,2013(9):73-74.
JIANG Xiaogang, Analysis of Water Leakage From Bored Pile Top and Control Measure [J]. China High-Tech Enterprises, 2013(9):73-74. |
[6] |
艾进荣. 钻孔灌注桩开挖后桩顶冒水原因分析及预防措施 [J]. 西部探矿工程,2009(11):23-24.
AI Jinrong, Analysis of Water Emitting from Drilling Bored Pile Top After Excavation and Control Measure [J]. West-China Exploration Engineering, 2009(11):23-24. |
[7] |
王哲,曹晓滨. 灌注桩桩身泌水的原因分析及控制 [J]. 化学工程与设备,2015(5):114-116.
WANG Zhe, CAO Xiaobing, Analysis of Water Bleeding from Bored Pile and Control Measure [J]. Chemical Engineering & Equipment, 2015(5):114-116. |