[1] |
刘永焕. 热电联产工程的供热机组选型 [J]. 工程设计与研究,1994, 87(12): 53-59.
LIU Yonghuan. Heating Unit Selection of Cogeneration Project [J]. Engineering Design and Research, 1994, 87(12): 53-59. |
[2] |
张建业,徐述.热电联产项目中机组的选型及参数确定方法 [J]. 电力设备,2008, 1(1): 72-75.
ZHANG Jianye, XU Shu. Cogeneration Projects' Unit Selection and Parameter Determination Method [J]. Electric Power Equipment, 2008, 1(1): 72-75. |
[3] |
邱张华,戴辉阳,阚安康,等.燃气热电联产系统的节能分析 [J]. 能源研究与信息,2007, 23(04): 237-242.
QIU Zhanghua, DAI Huiyang, KAN Ankang, et al. Gas Cogeneration System Energy Saving Analysis [J]. Journal of Energy Research and Information. 2007, 23(4): 237-242. |
[4] |
焦树建. 燃气-蒸汽联合循环 [M]. 1版. 北京:机械工业出版社,2000.
JIAO Shujian. Gas-steam Combined Cycle [M]. 1st ed. Beijing: Mechanical Industry Publishing House, 2000. |
[5] |
冯志军. 替代燃煤小热电的F级燃气热电联产机组的选型分析 [J]. 电力与能源,2014, 35(1): 67-72.
FENG Zhijun. Replace Coal-fired Thermal Power in F Grade Gas Cogeneration Units Selection Analysis [J]. Electric Power and Energy. 2014, 35(1): 67-72. |
[6] |
赵峰,李清龙,王伟. 电力市场中热电联产机组两部制电价机制的研究 [J]. 电网与清洁能源,2013, 29(6): 56-60.
ZHAO Feng, LI Qinglong, WANG Wei. Research on Two-Part Electricity Price of Combined Heat and Power Plant in the Electricity Market [J]. Power System and Clean Energy, 2013, 29(6): 56-60. |
[7] |
盛晓萍,李成仁. 我国电力需求侧电价机制适应性分析 [J]. 电力需求侧管理,2007, 9(6): 6-8.
SHENG Xiaoping, LI Chengren. Applicability Analysis of Demand Side Price Mechanism in China [J]. Power Demand Side Management, 2007, 9(6): 6-8. |