Advanced Search
Zhaoying ZHENG, Dengfu HE, Jingchao WANG, Weigang LEI, Xiang HUANG. Research on Comprehensive Planning Scheme for Informatization of Large-scale Port-Electricity-Coal Energy Base[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(1): 32-36,41. DOI: 10.16516/j.gedi.issn2095-8676.2015.01.006
Citation: Zhaoying ZHENG, Dengfu HE, Jingchao WANG, Weigang LEI, Xiang HUANG. Research on Comprehensive Planning Scheme for Informatization of Large-scale Port-Electricity-Coal Energy Base[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(1): 32-36,41. DOI: 10.16516/j.gedi.issn2095-8676.2015.01.006

Research on Comprehensive Planning Scheme for Informatization of Large-scale Port-Electricity-Coal Energy Base

  • With China's increasing demand for energy high-efficiency utilization, power investors, especially power producers with energy resources advantage have to face the challenge of green intelligent energy base. In this context, taking advantage of the information technology for energy base unified planning, unified construction, unified management service has become such an challenging issue that must be considered when the project is on the list awaiting for government green light. This paper from the perspective of the requirements, follows project construction of full life cycle, proposes building a digital dynamic energy base integrated platform, covering all stage of all data of project planning, design, construction, operations, and combineing three dimensional model, and geographic space information, and big data technology, and cloud technology, advanced of technology means. As a result, the integrat ed platform showcaseg a digital dynamic and operatable real scene of energy base.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return