Research on Flow Accelerated Corrosion Discussion for Secondary Loop Piping of Nuclear Power Plant

  • Based on the flow Accelerated Corrosion on the Secondary loop Piping of Nuclear Power Plant, this Paper Discussed About the Mechanism, Introduce the in Service Inspection Development in Different Country and also in China. To deal with FAC, this Paper Discussed the ways that can be Applied in the Design Process and Present the Available Scheme to Minimize it During the in Service Inspection, Whcih can be a Reference for such kind of Nuclear Power Plant.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return