Ziyi WU, Wei ZHOU, Yu XIAO. Analysis of Substation Project Cost Level in Sichuan and Tibet High Altitude Area[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(2): 133-139. DOI: 10.16516/j.gedi.issn2095-8676.2015.02.026
Citation: Ziyi WU, Wei ZHOU, Yu XIAO. Analysis of Substation Project Cost Level in Sichuan and Tibet High Altitude Area[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(2): 133-139. DOI: 10.16516/j.gedi.issn2095-8676.2015.02.026

Analysis of Substation Project Cost Level in Sichuan and Tibet High Altitude Area

  • In Tibet and Sichuan high-altitude area, power engineering construction scale expanding in recent years. Accurately grasp the cost level of the substation engineering in Sichuan Tibet high altitude area, reasonable control of investment and ensure investment benefits and the smooth implementation of the project, which is the technical difficulty worthy of further study and thinking. Just in the same area between Sichuan and Tibet, in the same altitude regions, on the basis of the Sichuan Tibet networking power engineering cost related statistical data, focus on analysis of the influence of different quota and cost standards′ changes on investment of Sichuan Tibet high altitude engineering, planning for the future construction of special high-voltage power grid to further optimize the economic rationality, mainly for the design experience.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return