Study on Installation and Construction of Plug-in Platform in Qikou 18-1 WHP1
-
Abstract
Insufficient capacity to compensate for production platforms, require additional production wells on the platform platform.Platform additional production wells on the premise of meeting the needs, also need to be considered to avoid additional platforms on the old platform itself the adverse effects of structural strength and stability, while also reducing offshore investment and construction difficulties, in accordance with specifications designed to plug well tank platform structure.This project through combines site construction environment, design out up to positioning and the oriented role of m framework and the inverted plug pointed structure, from design, and built, and installation multifaceted analysis research, success completed plug-in platform and old platform sea installation docking, level degrees and the parallel degrees meet specification and the construction requirements, for platform repair wells machine track beam of high precision installation lay has based, also for follow-up outside spread platform provides has site experience.
-
-