Advanced Search
Zhengyu HUANG. Research on Concrete Management Patterns of HPR1000 NPP[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(3): 116-121. DOI: 10.16516/j.gedi.issn2095-8676.2016.03.025
Citation: Zhengyu HUANG. Research on Concrete Management Patterns of HPR1000 NPP[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(3): 116-121. DOI: 10.16516/j.gedi.issn2095-8676.2016.03.025

Research on Concrete Management Patterns of HPR1000 NPP

  • This paper introduces the current situation of concrete management pattern in domestic nuclear power project and analyzes the advantages and disadvantages of concrete supply management patterns bewteen plan A and plan B for HPR1000 nuclear power project. Considering the great demand of concrete for HPR1000 nuclear power project, the paper mainly makes contrastive study to the A and B Supply pattern from the economic aspect. By making comprehensive analysis, it is concluded that A Supply is the optimal pattern from the perspective of reducing cost and project management. It is hoped that the research can provide reference for concrete management pattern of the following nuclear power project with the same type of unit.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return