Yuyan DUAN, Weike LI, Xiaoru FAN, Afeng WU, Peiqiang HUO, . Research on the Number of Mill in 660 MW Super-critical Unit of "W" Flame Furnace[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(1): 127-131. DOI: 10.16516/j.gedi.issn2095-8676.2018.01.022
Citation: Yuyan DUAN, Weike LI, Xiaoru FAN, Afeng WU, Peiqiang HUO, . Research on the Number of Mill in 660 MW Super-critical Unit of "W" Flame Furnace[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(1): 127-131. DOI: 10.16516/j.gedi.issn2095-8676.2018.01.022

Research on the Number of Mill in 660 MW Super-critical Unit of "W" Flame Furnace

More Information
  • Received Date: January 05, 2017
  • Revised Date: February 24, 2017
  • Relying on one 660 MW super critical "W" flame furnace coal-fired unit project, this article proposed a new proposal on the number of mill in pulverizing system. Through the technology and economic comparations between the general proposal of 6 mills and the new proposal of 4 mills, it was demonstrated that the new proposal of 4 sets double into and out mills is viable on technology, reliable on operation and good on economic benefit. This article proposed the new idea for drawing up the plan on pulverizing system of this type of unit.
  • [1]
    National Energy Bureau. Technical code for design and calculations of coal pulverizing system of fossil-fired power plant :DL/T 5145—2012[S]. Beijing:China Electric Power Press, 2016.
    [2]
    Ministry of Housing and Urban and Rural Construction in People′s Republic of China, State Administration of Quality Supervision, Inspection and Quarantine of People′s Republic of China. Code for design of fossil fired power plant:GB 50660—2011[S]. Beijing:China Planning Press, 2011.
  • Related Articles

    [1]JI Haibo, JING Maolin, ZHANG Heng. Analysis of Double-Hold Fault in RGL System of CPR1000 Unit[J]. SOUTHERN ENERGY CONSTRUCTION, 2022, 9(2): 101-106. DOI: 10.16516/j.gedi.issn2095-8676.2022.02.014
    [2]Afeng WU, Canshen TAN. Verification of the Implementation Effect of the Optimization Design Scheme of Flue Gas,Air and Pulverized Coal Pipeline for a 1 000 MW Unit[J]. SOUTHERN ENERGY CONSTRUCTION, 2021, 8(S1): 93-96. DOI: 10.16516/j.gedi.issn2095-8676.2021.S1.015
    [3]Kan LIN, Shi LIANG, Yusui LIU, Xiaoxiong WANG. Research on Instrument and Control Design and Control Strategy for Small Steam Turbine in Double-Turbine Regeneration System[J]. SOUTHERN ENERGY CONSTRUCTION, 2021, 8(4): 66-72. DOI: 10.16516/j.gedi.issn2095-8676.2021.04.009
    [4]Weizhe MA, Weijie CHENG, Shipeng ZHANG, Qin XU. Influence of Load Model to Out-of-step Oscillation Characteristics of Power System[J]. SOUTHERN ENERGY CONSTRUCTION, 2021, 8(1): 110-114. DOI: 10.16516/j.gedi.issn2095-8676.2021.01.016
    [5]Dongming DU, Canshen TAN, Xiangyu ZHANG. Discussion on Energy Saving and Consumption Reduction of Flue Gas, Air and Pulverized Coal Pipeline for 1 000 MW Unit[J]. SOUTHERN ENERGY CONSTRUCTION, 2021, 8(1): 87-92. DOI: 10.16516/j.gedi.issn2095-8676.2021.01.013
    [6]Hongwei HU, Chenggang DENG. Research on Thermal System with Double-deaerator[J]. SOUTHERN ENERGY CONSTRUCTION, 2020, 7(4): 98-101. DOI: 10.16516/j.gedi.issn2095-8676.2020.04.015
    [7]Jichuan LI. Research on New Clean Transit Technology of Coal Handling System[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(2): 43-48. DOI: 10.16516/j.gedi.issn2095-8676.2019.02.008
    [8]Jinmiao XU, Weike LI, Afeng WU, Xiaoru FAN. Research on 600 MW Supercritical W-flame Water Wall Cracking[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(1): 49-52. DOI: 10.16516/j.gedi.issn2095-8676.2017.01.008
    [9]HU Lingling. Research on the Layout Design of the Inlet Air Flow Measurement Device ofthe Positive Pressure Direct Injection System[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(S1): 31-34. DOI: 10.16516/j.gedi.issn2095-8676.2016.S1.008
    [10]XU Jinmiao, WU Afeng, FAN Xiaoru, LI Weike. Study on Steel Mill Ball Selection and Technique Economic Research[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 178-182. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.040
  • Cited by

    Periodical cited type(1)

    1. 李伟, 蔡勇, 张晓磊, 朱建平, 景雪晖. 深度调峰工况锅炉主要辅机运行安全性分析. 广东电力. 2019(11): 63-69 .

    Other cited types(0)

Catalog

    Peiqiang HUO

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (455) PDF downloads (18) Cited by(1)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return