Shi Tao, Wu Afeng, FAN Xiaoru, HUO Peiqiang. Analysis on Single or Double Row Fan Configuration for a 350 MW Heat Supply Unit[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(4): 59-63. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.009
Citation: Shi Tao, Wu Afeng, FAN Xiaoru, HUO Peiqiang. Analysis on Single or Double Row Fan Configuration for a 350 MW Heat Supply Unit[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(4): 59-63. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.009

Analysis on Single or Double Row Fan Configuration for a 350 MW Heat Supply Unit

More Information
  • Received Date: September 16, 2018
  • Revised Date: December 17, 2018
  •   [Introduction]  In order to analyze the reasonbility of the fan configuration of a 350 MW supercritical heating unit.
      [Method]  In this paper, the single-row configuration and double-row fan configuration was compared, it took the reliability of fans, the requirements of engineering heating and minimum annual fee method into congsideration.
      [Result]  The results demonstrate that the unstopped reliability rate of single-row fan configuration is slightly lower than double-row fan configuration. However, under the condition of high load operation, the heating supply reliability of single-row fan is higher.Single-row fan configuration econmic advantage is obvious.Therefore, it is more reasonable to adopt single-row fan for heating units which operats under high load operation for a long time.
      [Conclusion]  The conclusion of this study is not only applicable to this project, but also can provide guidance for other heating unit.
  • loading
  • [1]
    中华人民共和国住房和城乡建设部和中华人民共和国国家质量监督检验检疫总局. 大中型火力发电厂设计规范:GB 50660—2011 [S]. 北京:中国计划出版社,2011.

    The Ministry of Housing and Urban-rural Development of the People′s Republic of China & General Administration of Quality Supervision,Inspection and Quarantine of the People′s Republic of China. Code for design of fossil fired power plant:GB 50660—2011 [S]. Beijing:China Planning Press,2011.
    [2]
    吴阿峰,谭灿燊. 火力发电厂风机单双列配置的技术经济分析 [J].发电设备,2012,26(2):88-92.

    WU A F,TAN C S. Technical and economical analysis on single-and dual-train fan configuration in thermal power plants [J]. Power Equipment,2012,26(2):88-92.
    [3]
    李丽君,韩建英,陈兵兵. 锅炉单列辅机配置对机组运行可靠性研究 [J]. 电站系统工程,2015,31(3):37-40.

    LI L J,HAN J Y,CHEN B B. Study on reliability analysis of single auxiliary equipment configuration for boiler [J]. Power System Engineering,2015,31(3):37-40.
    [4]
    吴阿峰,潘灏,谭灿燊. 1 GW超超临界燃煤锅炉引风机配置的技术经济分析 [J]. 发电设备,2009,23(2):136-139+143.

    WU A F,PAN H,TAN C S. Configuration of induced fan for coal-fired boilers of 1 GW ultra supercritical power plants [J]. Power Equipment,2009,23(2):136-139+143.
    [5]
    赵予生,林久春. 1 GW机组锅炉联合引风机应用分析 [J]. 吉林电力,2013,41(1):49-51.

    ZHAO Y S,LIN J C. Application analysis of 1 GW boiler combined induced fan [J]. Jilin Electric Power,2013,41(1):49-51.

Catalog

    HUO Peiqiang

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Figures(1)  /  Tables(3)

    Article Metrics

    Article views PDF downloads Cited by()
    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return