Advanced Search
LI Shuncai, LI Jiangfeng, LIU Xin, ZHANG Hongbo. Discussion on Tsunami Protection of Coastal Nuclear Power Plantin China[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(4): 118-122. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.019
Citation: LI Shuncai, LI Jiangfeng, LIU Xin, ZHANG Hongbo. Discussion on Tsunami Protection of Coastal Nuclear Power Plantin China[J]. SOUTHERN ENERGY CONSTRUCTION, 2019, 6(4): 118-122. DOI: 10.16516/j.gedi.issn2095-8676.2019.04.019

Discussion on Tsunami Protection of Coastal Nuclear Power Plantin China

More Information
  • Received Date: January 28, 2019
  • Revised Date: June 09, 2019
  •   [Introduction]  Most of the nuclear power plants under construction and operation in China are coastal sites. According to the previous observation data and analysis, storm surge is the dominant condition in flood control design. There are few research results on tsunami, and there is a lack of engineering experience in the protection methods of structures against tsunami. After the Fukushima nuclear accident, the impact of the tsunami on the safety of nuclear power plants has been widely concerned by nuclear safety supervision, nuclear power practitioners and the public. In China, the tsunami protection level of nuclear power plants in operation has also been reviewed.
      [Method]  Based on the characteristics of tsunami and taking a nuclear power plant in coastal China as an example, this paper carried out the tsunami protection review of nuclear power plant through the physical model test research of tsunami wave.
      [Result]  The model test results show that under the action of tsunami wave, the level elevation of coastal nuclear power plants built in China is adequate for offshore tsunami protection.
      [Conclusion]  Combining with the existing flood control measures in the sea area, further consideration should be given to the protection against possible earthquake and tsunami in Manila and Ryukyu trenches in order to increase the safety margin in the design of the subsequent newly built coastal nuclear power plant in the light of site conditions.
  • [1]
    姚远,蔡树群,王盛安. 海啸波数值模拟的研究现状 [J]. 海洋科学进展,2007(4):487-494.

    YAO Y,CAI S Q,WANG S A. Present status of study on numerical simulation of tsunami wave [J]. Advances in Marine Science,2007(4):487-494.
    [2]
    温燕玲,朱元清. 海啸传播模型与数值模拟研究进展 [J]. 地震地磁观测与研究,2007(5):143-149.

    WEN Y L,ZHU Y Q. The research progress of tsunami propagation models and numerical simulation [J]. Seismological and Geomagnetic Observation and Research,2007(5):143-149.
    [3]
    张超凡,石耀霖. 海啸灾害的数值模拟研究 [J]. 中国科学院研究生院学报,2008(3):289-296.

    ZHANG C F,SHI Y L. Numerical simulation research on tsunami hazards [J]. Journal of the Graduate School of the Chinese Academy of Sciences,2008(3):289-296.
    [4]
    郭耀武,刘鑫,温洪涌. 海啸对我国滨海核电厂厂坪标高的影响 [J]. 科技创新导报,2015,23(1):97-98.

    GUO Y W,LIU X,WEN H Y. The impact of tsunami on the elevation of coastal nuclear power plant in China [J]. Technological Innovation,2015,23(1):97-98.
    [5]
    中广核工程有限公司. 核电厂海啸防护工程设计与措施研究报告 [R]. 深圳:深圳中广核工程设计有限公司,2014:58.

    CGN Engineering Co., Ltd. The research report on the engineering design and measures of the tsunami protection in the nuclear power plants [R]. Shenzhen:China Nuclear Power Design Co., Ltd(Shenzhen),2014:58.
    [6]
    常向东,周本刚. 我国沿海核电厂地震海啸影响分析 [J]. 核安全,2011,4(4):45-51.

    CHANG X D,ZHOU B G. Analysis about tsunami effect on nuclear power plant in coast of China [J]. Nuclear Safety,2011,4(4):45-49.
  • Related Articles

    [1]JIE Tianyu, GONG Youjun, YAN Ziwei. Lightning Performance and Protection Measures of 500 kV AC Overhead Transmission Lines[J]. SOUTHERN ENERGY CONSTRUCTION, 2024, 11(S1): 56-64. DOI: 10.16516/j.ceec.2024.S1.09
    [2]ZHOU Dezong, BI Mingjun, ZHANG Haidong, ZHANG Wei, ZHANG Guizhi. Experimental Research on Scour Protection Range and Protection Effect of Large Diameter Monopile Foundation[J]. SOUTHERN ENERGY CONSTRUCTION, 2023, 10(1): 72-80. DOI: 10.16516/j.gedi.issn2095-8676.2023.01.009
    [3]Rong SU, Guokai YUAN. Protection Schemes of Submarine Power Cables in Offshore Wind Farm[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(2): 121-125. DOI: 10.16516/j.gedi.issn2095-8676.2018.02.017
    [4]Feng YI. Research on Radiation Protection of Proton Therapy Facility[J]. SOUTHERN ENERGY CONSTRUCTION, 2017, 4(2): 64-68. DOI: 10.16516/j.gedi.issn2095-8676.2017.02.010
    [5]Wei DING. Comparison and Analysis of IEC and GB Lightning Protection Standards on Direct Lightning Flash Protection[J]. SOUTHERN ENERGY CONSTRUCTION, 2016, 3(1): 110-114,95. DOI: 10.16516/j.gedi.issn2095-8676.2016.01.023
    [6]HUANG Weifang, JIN Xin, WEN An, WEI Chengzhi, LIU Nian. PTN Security Capability and Applicability Analysis of Wide Area Protection and Control System[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 161-164. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.036
    [7]YANG Yuan, ZHOU Wei, WANG Shaoyong, TAN Jiangping, XU Longbo. Fire Protection Design of Offshore Wind Farm[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 93-97. DOI: 10.16516/j.gedi.issn2095-8676.2015.S1.020
    [8]Tianming JIANG, Chuang LI. Impact Analysis of Vertical Arrangement for Conventional Island in Nuclear Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 128-131. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.023
    [9]Fengbo XIE, Linggang ZENG. Research on Fire Protection Stabilized Pressure System of a Gigawatt-scale Nuclear Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 93-95. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.016
    [10]Chuangshu XIE. Design and Setting of Zero-sequence Current Differential Protection for Transformers in Nuclear Power Plants[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(4): 74-80. DOI: 10.16516/j.gedi.issn2095-8676.2015.04.013
  • Cited by

    Periodical cited type(1)

    1. 李飞,梁清鹤,刘然,李瑞坤. 凝汽器下沉对机组经济性的影响及其优化机制. 广东电力. 2023(10): 114-120 .

    Other cited types(0)

Catalog

    ZHANG Hongbo

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (798) PDF downloads (50) Cited by(1)

    /

    DownLoad:  Full-Size Img  PowerPoint