Introduction In order to further optimize the design of meter testing and storage, this paper proposes a Demo3D simulation based survey and design method of the “intelligent meter testing line and storage system”, which reduces the work intensity of designers as much as possible on the premise of guaranteeing the advancement, integrity and correctness of the scheme. Method The method included basic design input data collection, parameter calculation, testing line key parameters calculaiton, Intelligent warehouse key parameters calculation, simulation input parameters calculation, simulation design work, simulation output work and output design results.
Result This method provides relevant technical support for construction units, designers, equipment manufacturers and construction units, and improves the efficiency and correctness of the scheme and data flow process.
Conclusion This proposed method is gradually put into the practical design work in many areas, and has been fully verified and applied in practical work, which proves that the method is feasible, and provides guidance and key technical support for practical application.