Discussion on General Layout Characteristics of ″Developing Large Units and Suppressing Small Ones″ Rebuilding Project
doi: 10.16516/j.gedi.issn2095-8676.2015.S1.030
- Received Date: 2015-03-01
-
Key words:
- power layout /
- energy saving and emission reduction /
- shutdown small coal—fired power plant then construct large one /
- rebuild
Abstract: By the project, the author tries to analyze the design characteristics of "large power plant replace small one" rebuild project on fixed site, especially on site utilized, the utilized and rebuild establishments of the old power plant, the influences on the power plant, the relations of this rebuild project and the old power plant, and so on. At last, the characteristics of the rebuild project layout are summarized. The author wishes to exchange each other.
Citation: | ZHU Caifeng. Discussion on General Layout Characteristics of ″Developing Large Units and Suppressing Small Ones″ Rebuilding Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 135-139. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.030 |