LI Xiaozhen. Research on Technical Transformation Strategy of Secondary Equipment Based on the Life Cycle Cost[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 212-217,225. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.047
Citation: LI Xiaozhen. Research on Technical Transformation Strategy of Secondary Equipment Based on the Life Cycle Cost[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 212-217,225. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.047

Research on Technical Transformation Strategy of Secondary Equipment Based on the Life Cycle Cost

doi: 10.16516/j.gedi.issn2095-8676.2015.S1.047
  • Received Date: 2015-10-28
  • Based on the operating characteristics and maintenance strategies of secondary equipment, This paper constructs a lifecycle technical transformation policy model of secondary device using fixed benefit method, analyzed secondary equipment life cycle costs,determine the quantitative calculation method, and the evaluation index and evaluation standard of fixed benefit method. Finally, this paper conducted a Examples Analysis using the Automation System Data of Guangdong power grid.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(180) PDF downloads(94) Cited by()

Related

Research on Technical Transformation Strategy of Secondary Equipment Based on the Life Cycle Cost

doi: 10.16516/j.gedi.issn2095-8676.2015.S1.047

Abstract: Based on the operating characteristics and maintenance strategies of secondary equipment, This paper constructs a lifecycle technical transformation policy model of secondary device using fixed benefit method, analyzed secondary equipment life cycle costs,determine the quantitative calculation method, and the evaluation index and evaluation standard of fixed benefit method. Finally, this paper conducted a Examples Analysis using the Automation System Data of Guangdong power grid.

LI Xiaozhen. Research on Technical Transformation Strategy of Secondary Equipment Based on the Life Cycle Cost[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 212-217,225. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.047
Citation: LI Xiaozhen. Research on Technical Transformation Strategy of Secondary Equipment Based on the Life Cycle Cost[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 212-217,225. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.047