Study on Construction Bid Section Division of Coal-fired Power Plants Project
doi: 10.16516/j.gedi.issn2095-8676.2015.S1.051
- Received Date: 2015-06-11
-
Key words:
- coal-fired power plants /
- construction bid section division /
- the theory of transaction costs /
- DUYEN HAI 1 thermal power plant project
Abstract: Introduce the engineering characteristics of coal-fired power plants project briefly and choose a theoretical calculation model-bid section division model based on the theory of transaction cost. Use the bid section division model based on the theory of transaction costs to calculate the result of DUYEN HAI 1 THERMAL POWER PLANT PROJECT's bid sections division, discuss the advantage and disadvantage of this model and put forward the improvement of the theoretical calculation model in actual application.
Citation: | WANG Hao. Study on Construction Bid Section Division of Coal-fired Power Plants Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2015, 2(S1): 230-233. doi: 10.16516/j.gedi.issn2095-8676.2015.S1.051 |