Research on Construction of the Owner Project Quality Supervision and Management Mechanism Under the NPP General Contract Mode
- Received Date: 2016-01-01
- Publish Date:
2020-07-17
-
Abstract
As the project management level of our country continues to improve, the engineering contracting mode in engineering application is gradually deepening. Especially in the petroleum, chemical and other industries use earlier, but for nuclear power engineering general contracting mode in China started late, especially in nuclear power engineering because of " nuclear" and other projects has a special side, that is, the need to more high quality to ensure nuclear safety. As the owners of nuclear power party how to do the general contracting mode of engineering quality supervision management ponder. This article from 5 aspects elaborated how to build the nuclear power project general contracting mode of the owner of the project quality supervision and management mechanism, in order to achieve from the mechanism to ensure the quality of nuclear power projects.
-
References
[1]
|
中国质量协会. 全面质量管理 [M]. 3版. 北京:中国科学技术出版社,2014. |
[2]
|
中国质量协会. QC小组基础教材 [M]. 2版. 北京:中国社会出版社,2009. |
[3]
|
杨朝东. 核电工程总承包的质量管理[J]. 项目管理,2009(2): 7-11. |
-
-