Jiakai WU, Tao HUANG. Research on Equipment Selection Technology of FCB Function Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(1): 59-62. doi: 10.16516/j.gedi.issn2095-8676.2018.01.009
Citation:
|
Jiakai WU, Tao HUANG. Research on Equipment Selection Technology of FCB Function Power Plant[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(1): 59-62. doi: 10.16516/j.gedi.issn2095-8676.2018.01.009
|
Research on Equipment Selection Technology of FCB Function Power Plant
- 1.
China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, China
- Received Date: 2017-06-20
- Rev Recd Date:
2017-08-16
- Publish Date:
2018-03-25
-
Abstract
For the thermal power plant with FCB function, there are special requirements on design. By researching FCB transient and steady process, in contrast to normal power plant, we found out the important selection differences of bypass valve capacity, feedwater pump capacity and driving-turbine steam supplying, deaerator water storage capacity and heating-steam supplying, high pressure heater heating- steam supplying etc. Based on several engineerings design experience, we determined the correct selection of these auxiliary equipments. Thus, power plant can be realized FCB function safely and reliably. The method has important reference value for the design of FCB function power plant.
-
References
[1]
|
冯伟忠. 900 MW超临界机组FCB试验 [J]. 中国电力,2005,38(2): 74-77.
FENG W Z. FCB test for 900 MW supercritical units [J]. Electric Power, 2005, 38(2): 74-77. |
[2]
|
冯伟忠. 1 000 MW超超临界机组FCB试验 [J]. 中国电力,2008,41(10): 62-66.
FENG W Z. FCB test on 1 000 MW ultra-supercritical power generation unit [J]. Electric Power, 2008, 41(10): 62-66. |
[3]
|
冯伟忠. 大机组实现FCB的现实性及技术分析 [J]. 上海电力,2007(3): 246-251.
FENG W Z. The realism and technical analysis of implementing FCB for the large coal-fired power units [J]. Shanghai Electric Power, 2007(3): 246-251. |
[4]
|
沈丛奇,周新雅,姚峻. 火电机组FCB功能及其在电网恢复中的应用 [J]. 上海电力,2007(3): 251-254.
SHEN C Q, ZHOU X Y, YAO J. FCB function of coal-fired power unites and its application in power grid restoration [J]. Shanghai Electric Power, 2007(3): 251-254. |
[5]
|
郭鑫. 大型发电机组FCB功能的探讨 [J]. 华北电力技术,2010(2): 22-23.
GUO X. Discussion of FCB function of large power generation set [J]. North China Electric Power, 2010(2): 22-23. |
[6]
|
王立地,林苗丹. FCB工况下100%汽轮机旁路合理性探讨 [J]. 电力技术,2010,19(11): 39-44.
WANG L D, LIN M D. Discussion on the rationality of the 100% capacity of steam turbine bypass under FCB conditions [J]. Electric Power Technology, 2010, 19(11): 39-44. |
[7]
|
谭金. 国产超临界机组实现快速切负荷的若干技术问题探讨 [J]. 广东电力,2010,23(10): 50-53.
TAN J. Discussion of technical problems in FCB on home made supercritical units [J]. Guangdong Electric Power, 2010, 23(10): 50-53. |
-
-