YUE Zengkun, LIU Yanhua, WANG Jianwu, LU Xiang. Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 95-99. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.017
Citation: YUE Zengkun, LIU Yanhua, WANG Jianwu, LU Xiang. Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 95-99. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.017

Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.017
  • Received Date: 2017-12-04
  • Rev Recd Date: 2018-03-02
  • Publish Date: 2020-07-11
  • [Introduction] The discrepancy between design drawings and construction layouts has become one of the principle problems during the construction of convertor station. [Method] In this paper, a Three-Stage Management Mode for discrepancy elimination was discussed, which was implemented in newly built convertor stations of China Southern Power Grid. In this Mode, staged discrepancy eliminating solutions focusing respectively on preliminary design, detailed design and construction were provided. [Result] It helps to clarify the responsibilities and obligations of parties involved in the project, reduce the number of the discrepancies. [Conclusion] This mode can avoid waste of manpower and other resources for rectification of those discrepancies, and thus improve the efficiency of project management and proceed the project into commercial operation smoothly.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(349) PDF downloads(28) Cited by()

Related

Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.017

Abstract: [Introduction] The discrepancy between design drawings and construction layouts has become one of the principle problems during the construction of convertor station. [Method] In this paper, a Three-Stage Management Mode for discrepancy elimination was discussed, which was implemented in newly built convertor stations of China Southern Power Grid. In this Mode, staged discrepancy eliminating solutions focusing respectively on preliminary design, detailed design and construction were provided. [Result] It helps to clarify the responsibilities and obligations of parties involved in the project, reduce the number of the discrepancies. [Conclusion] This mode can avoid waste of manpower and other resources for rectification of those discrepancies, and thus improve the efficiency of project management and proceed the project into commercial operation smoothly.

YUE Zengkun, LIU Yanhua, WANG Jianwu, LU Xiang. Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 95-99. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.017
Citation: YUE Zengkun, LIU Yanhua, WANG Jianwu, LU Xiang. Research on Resolution and the Discrepancy Between the Electronic Secondary Construction Drawing and Pratical Construction[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 95-99. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.017

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return