YANG Wei, LI Bo. Research on a New Device of Intake and Desilting in Mountain River[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 113-116. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.020
Citation: YANG Wei, LI Bo. Research on a New Device of Intake and Desilting in Mountain River[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 113-116. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.020

Research on a New Device of Intake and Desilting in Mountain River

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.020
  • Received Date: 2017-11-27
  • Rev Recd Date: 2018-01-04
  • Publish Date: 2020-07-11
  • [Introduction] There are a lot of problems such as sediment deposition in mountainous rivers to endanger the safety of water intake. We must adopt safe and effective water extraction installations to ensure the safe operation of power plants. Although existing water abstraction technology has reduced the harm to a certain extent, various problems still exist. [Method] This article analyzed some of the problems that existing in water extraction installations, through the optimization of layout, reducing the pump floor elevation, combining the pier and structures and flushing sluice lifting equipment through the pump room indoor and other measures to eliminate the problem of existing water extraction installations. [Result] A new water extraction installations is put forward, that can effcetively increase the pump suction depth, optimize flow pattern, facilitate equipment maintenance to further improve the safety of water intake to ensure the safe operation of power plants. [Conclusion] This water extraction installations can be used in the mountainous river intake project to bring good economic benefit.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(348) PDF downloads(26) Cited by()

Related

Research on a New Device of Intake and Desilting in Mountain River

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.020

Abstract: [Introduction] There are a lot of problems such as sediment deposition in mountainous rivers to endanger the safety of water intake. We must adopt safe and effective water extraction installations to ensure the safe operation of power plants. Although existing water abstraction technology has reduced the harm to a certain extent, various problems still exist. [Method] This article analyzed some of the problems that existing in water extraction installations, through the optimization of layout, reducing the pump floor elevation, combining the pier and structures and flushing sluice lifting equipment through the pump room indoor and other measures to eliminate the problem of existing water extraction installations. [Result] A new water extraction installations is put forward, that can effcetively increase the pump suction depth, optimize flow pattern, facilitate equipment maintenance to further improve the safety of water intake to ensure the safe operation of power plants. [Conclusion] This water extraction installations can be used in the mountainous river intake project to bring good economic benefit.

YANG Wei, LI Bo. Research on a New Device of Intake and Desilting in Mountain River[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 113-116. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.020
Citation: YANG Wei, LI Bo. Research on a New Device of Intake and Desilting in Mountain River[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 113-116. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.020