ZHENG Boxing, SU Rong, FENG Yimin. Research on the Risk Analysis and Control of the Offhore Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 228-231. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.041
Citation: ZHENG Boxing, SU Rong, FENG Yimin. Research on the Risk Analysis and Control of the Offhore Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 228-231. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.041

Research on the Risk Analysis and Control of the Offhore Substation

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.041
  • Received Date: 2018-01-17
  • Rev Recd Date: 2018-05-21
  • Publish Date: 2020-07-11
  • [Introduction] With the rising of the demand for the environmental protection, Offshore wind power industry in China becomes vigorous, investors pay more attention to make sure the offsore wind power safe. [Method] In this paper, with risk management process, risks of the survey、design、building、construction、transportation、installation of the offshore substation were analyzed comprehensively. [Result] The treaments for the risks of borehole layout、confirmation of marine soil parameters、fatigue failure、building、 piling、construction window period、transportation and installation of integral assembling of the offshore substation are put forward. [Conclusion] The conclusion of this paper is the reference for the risk management of offshore wind farm.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(315) PDF downloads(59) Cited by()

Related

Research on the Risk Analysis and Control of the Offhore Substation

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.041

Abstract: [Introduction] With the rising of the demand for the environmental protection, Offshore wind power industry in China becomes vigorous, investors pay more attention to make sure the offsore wind power safe. [Method] In this paper, with risk management process, risks of the survey、design、building、construction、transportation、installation of the offshore substation were analyzed comprehensively. [Result] The treaments for the risks of borehole layout、confirmation of marine soil parameters、fatigue failure、building、 piling、construction window period、transportation and installation of integral assembling of the offshore substation are put forward. [Conclusion] The conclusion of this paper is the reference for the risk management of offshore wind farm.

ZHENG Boxing, SU Rong, FENG Yimin. Research on the Risk Analysis and Control of the Offhore Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 228-231. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.041
Citation: ZHENG Boxing, SU Rong, FENG Yimin. Research on the Risk Analysis and Control of the Offhore Substation[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 228-231. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.041

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return