Research on Procurement Schedule Management of Large-scale Power Plant EPC Project
doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043
- Received Date: 2017-12-23
- Rev Recd Date: 2018-02-07
- Publish Date: 2020-07-11
-
Key words:
- critical chain project management /
- EPC /
- engineering procurement /
- schedule management
Abstract: [Introduction] The schedule management of the procurement plan has been the prime focus of the thesis. In this investigation we measured the procurement schedule using the critical chain project management. The results have shown that there are obvious advantages when the critical chain project management is applied, compared to the traditional schedule management. [Method] Thus, we demonstrated the feasibility of concluding some approach on how to manage the procurement schedule in the large-scale EPC project based on the critical chain project management. [Result] The critical chain project managemen emphasizes the importance of identifying core equipment and materials, rationally allocating human resources, setting up appropriate buffer and early warning signals, and playing the role of procurement as a bridge connecting design and construction, so as to effectively strengthen procurement schedule management. [Conclusion] This work provides some guidance for further study on work of schedule management in the EPC project.
Citation: | YUAN Liya. Research on Procurement Schedule Management of Large-scale Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 237-241. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043 |