YUAN Liya. Research on Procurement Schedule Management of Large-scale Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 237-241. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043
Citation: YUAN Liya. Research on Procurement Schedule Management of Large-scale Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 237-241. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043

Research on Procurement Schedule Management of Large-scale Power Plant EPC Project

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043
  • Received Date: 2017-12-23
  • Rev Recd Date: 2018-02-07
  • Publish Date: 2020-07-11
  • [Introduction] The schedule management of the procurement plan has been the prime focus of the thesis. In this investigation we measured the procurement schedule using the critical chain project management. The results have shown that there are obvious advantages when the critical chain project management is applied, compared to the traditional schedule management. [Method] Thus, we demonstrated the feasibility of concluding some approach on how to manage the procurement schedule in the large-scale EPC project based on the critical chain project management. [Result] The critical chain project managemen emphasizes the importance of identifying core equipment and materials, rationally allocating human resources, setting up appropriate buffer and early warning signals, and playing the role of procurement as a bridge connecting design and construction, so as to effectively strengthen procurement schedule management. [Conclusion] This work provides some guidance for further study on work of schedule management in the EPC project.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(350) PDF downloads(53) Cited by()

Related

Research on Procurement Schedule Management of Large-scale Power Plant EPC Project

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043

Abstract: [Introduction] The schedule management of the procurement plan has been the prime focus of the thesis. In this investigation we measured the procurement schedule using the critical chain project management. The results have shown that there are obvious advantages when the critical chain project management is applied, compared to the traditional schedule management. [Method] Thus, we demonstrated the feasibility of concluding some approach on how to manage the procurement schedule in the large-scale EPC project based on the critical chain project management. [Result] The critical chain project managemen emphasizes the importance of identifying core equipment and materials, rationally allocating human resources, setting up appropriate buffer and early warning signals, and playing the role of procurement as a bridge connecting design and construction, so as to effectively strengthen procurement schedule management. [Conclusion] This work provides some guidance for further study on work of schedule management in the EPC project.

YUAN Liya. Research on Procurement Schedule Management of Large-scale Power Plant EPC Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 237-241. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.043