Lü Wensheng. Seawater Freezing Technology for Reparing Submarine Turnnel in Construction of 220 kV Huayue Line Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 262-266. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.048
Citation: Lü Wensheng. Seawater Freezing Technology for Reparing Submarine Turnnel in Construction of 220 kV Huayue Line Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 262-266. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.048

Seawater Freezing Technology for Reparing Submarine Turnnel in Construction of 220 kV Huayue Line Project

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.048
  • Received Date: 2018-11-05
  • Rev Recd Date: 2018-11-11
  • Publish Date: 2020-07-11
  • [Introduction] Under construction in 220 kV Huayue line submarine tunnel project, some emergency danger occurred because of seawater inflow. [Method] The advantage of freshwater freezing technology had been tried to solve this problem. After several tests of the seawater and soil sample, some calculations were done according to the test data and freshwater freezing theory. [Result] The problem has been resolved successfully by seawater freezing. The seawater freezing technology has been used for the first time in the nation. Due to this method, the construction can be continuously done according to existing plan, otherwise this tunnel may have to scrap. [Conclusion] The seawater freezing technology is very efficient and economic to deal with seawater inflow of tuneling under seawater.
  • 通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

Article Metrics

Article views(284) PDF downloads(20) Cited by()

Related

Seawater Freezing Technology for Reparing Submarine Turnnel in Construction of 220 kV Huayue Line Project

doi: 10.16516/j.gedi.issn2095-8676.2018.S1.048

Abstract: [Introduction] Under construction in 220 kV Huayue line submarine tunnel project, some emergency danger occurred because of seawater inflow. [Method] The advantage of freshwater freezing technology had been tried to solve this problem. After several tests of the seawater and soil sample, some calculations were done according to the test data and freshwater freezing theory. [Result] The problem has been resolved successfully by seawater freezing. The seawater freezing technology has been used for the first time in the nation. Due to this method, the construction can be continuously done according to existing plan, otherwise this tunnel may have to scrap. [Conclusion] The seawater freezing technology is very efficient and economic to deal with seawater inflow of tuneling under seawater.

Lü Wensheng. Seawater Freezing Technology for Reparing Submarine Turnnel in Construction of 220 kV Huayue Line Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 262-266. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.048
Citation: Lü Wensheng. Seawater Freezing Technology for Reparing Submarine Turnnel in Construction of 220 kV Huayue Line Project[J]. SOUTHERN ENERGY CONSTRUCTION, 2018, 5(S1): 262-266. doi: 10.16516/j.gedi.issn2095-8676.2018.S1.048

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return